STEP 2 (See Diagram 2)
A.) Attach the Right Vertical Beam (#2) to the Right Base Frame (#1). Secure it with two M10
x 2 ½” Carriage Bolts (#82),
∅
¾” Washers (#93), and M10 Aircraft Nuts (#90). NOTE:
Do not tighten the Nuts and Bolts yet.
B.) Attach the Right Seat Support (#8) to the Right Base Frame (#1). Secure it with one M10
x 2 ½” Carriage Bolt (#82),
∅
¾” Washer (#93), and M10 Aircraft Nut (#90).
C.) Attach the Right Seat Support (#8) to the Right Vertical Beam (#2). Secure it with one
Bracket (#47), two M10 x 2 ½” Carriage Bolts (#82), two
∅
¾” Washers (#93), and two
M10 Aircraft Nuts (#90).
D.) Attach the Leg Developer (#9) to the Right Seat Support (#8). Secure it with one M10 x 2”
Axle (#56), two M10 x ¾” Allen Bolts (#86), and two
∅
¾” Washers (#93). NOTE: Do not
over tighten the bolts. Make sure the Leg Developer is able to swivel.
DIAGRAM
2
6
Содержание MARCY MWM 1801
Страница 4: ...HARDWARE PACK 3...
Страница 5: ...HARDWARE PACK 4...
Страница 9: ...DIAGRAM 3 8...
Страница 11: ...DIAGRAM 4 10...
Страница 14: ...Cable Loop Diagram for Butterfly Station 13...
Страница 15: ...Cable Loop Diagram for Bench Press Station 14...
Страница 19: ...DIAGRAM 9 18...
Страница 22: ...DIAGRAM 11 21...