STEP 4 (See Diagram 4)
A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with
an Axle (#17), two M10 x ¾” Allen Bolts (#35), and two
∅
¾” Washers (#41).
B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam
Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls (#24)
onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into the ends.
C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a
Spring Clip (#22) to the Sleeve.
DIAGRAM 4
22
Содержание MARCY DIAMOND ELITE MD PWR-8
Страница 5: ...CAGE HARDWARE PACK 4 ...
Страница 6: ...CAGE HARDWARE PACK 5 ...
Страница 11: ...DIAGRAM 4 10 ...
Страница 12: ...CABLE LOOP DIAGRAM 11 ...
Страница 14: ...DIAGRAM 5 13 ...
Страница 16: ...DIAGRAM 6 15 ...
Страница 17: ...EXPLODED DIAGRAM 16 ...
Страница 19: ...MULTI PURPOSE BENCH HARDWARE PACK 18 ...
Страница 25: ...24 ...