STEP 4 (See Diagram 4)
A.) Do not tighten all Nuts and Bolts in this step until instructed to do so.
B.) Attach the Right Vertical Frame (#5) to the Right Base Frame (#1). Secure it with two M10 x
2 ½” Carriage Bolts (#98), Ø ¾” Washers (#109), and M10 Aircraft Nuts (#106).
C.) Attach the Left Vertical Frame (#6) to the Left Base Frame (#2). Secure it with one M10 x 2
½” Carriage Bolt (#98), Ø ¾” Washer (#109), and M10 Aircraft Nut (#106).
D.) Attach the Power Station Vertical Frame (#7) to the Power Station Base Frame (#3). Secure
it with one M10 x 2 ½” Carriage Bolt (#98), Ø ¾” Washer (#109), and M10 Aircraft Nut
(#106).
DIAGRAM 4
10
Содержание IRON GRIP STRENGTH TSA-9900
Страница 5: ...HARDWARE PACK 4 ...
Страница 6: ...HARDWARE PACK 5 ...
Страница 7: ...HARDWARE PACK 6 ...
Страница 14: ...DIAGRAM 6 13 ...
Страница 19: ...CABLE LOOP DIAGRAM 18 ...
Страница 21: ...DIAGRAM 11 20 ...
Страница 24: ...DIAGRAM 13 23 ...
Страница 27: ...DIAGRAM 15 26 ...