STEP 2 (See Diagram 2)
A.) Attach a Diagonal Support (#4) to the Lower Upright Beam (#5) and the Right Base
Frame (#2). Secure it to the Lower Upright Beam with two M10 x 3” Carriage Bolts
(#20), Ø 1 ¼” Bent Washers (#22), and M10 Aircraft Nuts (#18). Secure it to the
Right Base Frame with two M10 x 2 ¾” Carriage Bolts (#19), one 4 ¾” Bracket
(#13), two Ø ¾” Washers (#17), and two M10 Aircraft Nuts (#18).
B.) Attach a Dip Support (#9) to the Lower Upright Beam. Align the holes and secure
them with two M10 x 3 1/8” Carriage Bolts (#21), one Curve Bracket (#11), and two
M10 Aircraft Nuts (#18). Repeat the same stop to install the other side.
C.) Attach two Upper Upright Beams (#6) onto the Lower Upright Beams (#5).
D.) Connect the two Upright Beams with a Cross Brace (#7) in the middle. Secure each
side with two M10 x 3” Carriage Bolts (#20),
∅
1 ¼” Bent Washers (#22) and M10
Aircraft Nuts (#18). Do NOT tighten all the Nuts and Bolts yet.
E.) Attach a Vertical Handle (#8) to the Dip Support. Secure it with one M10 x 1” Allen
Bolt (#31) and Ø ¾” Bent Washer (#24). Repeat to install the other side.
6
Содержание IRON GRIP IGS-2215
Страница 5: ...HARDWARE PACK 4 ...
Страница 8: ...DIAGRAM 2 7 ...
Страница 10: ...EXPLODED DIAGRAM 9 ...