STEP 10 (See Cable Loop Diagram & Diagram 10)
A.) Insert the 151.6” Lower Cable (#30) through the opening on bottom of the Leg
Developer (#11). Attach a Pulley (#28) to the opening. Secure it with one M10 x
2 3/8” Allen Bolt (#46), two
∅
7/8” Pulley Bushings (#51), and one M10 Aircraft
Nut (#55).
B.) Draw the Cable underneath the Pulley and through the opening on the bottom of
the Main Seat Support to the open bracket on the Main Base Frame (#6).
C.) Attach a Pulley to the bracket. Secure it with one M10 x 1 ¾” Allen Bolt (#45),
two
∅
¾” Washers (#53), and one M10 Aircraft Nut (#55).
D.) Pull the Cable towards the back of the machine through the bottom opening on
the Front Lower Vertical Beam (#82) to the open bracket on the Main Base
Frame (#6). Repeat the Procedure C to install a Pulley.
E.) Draw the Cable underneath the Pulley then upward to the Angled Floating Pulley
Bracket (#19) previously installed. Repeat the Procedure C to install a Pulley to
the open bracket.
F.) Draw the Cable around the Pulley then downward to the last open bracket on the
Main Base Frame. Repeat the Procedure C to install a Pulley.
G.) Draw the Cable underneath the Pulley then pull upward to the Double Floating
Pulley Bracket (#18) previously installed. Connect the Cable to the Short Chain
(#58) with a C-clip (#57). Then connect the Chain to the Bracket with a M10 x 1”
Allen Bolt (#75), two
∅
¾” Washers (#53) and one M10 Aircraft Nut (#55).
H.) Adjust the length of the Short Chain to adjust the tension of the Cables. If there
is too much sag in the cables, shorten the Chain.
17
Содержание COMPETITOR CG 1400
Страница 4: ...HARDWARE PACK 3 ...
Страница 5: ...HARDWARE PACK 4 ...
Страница 6: ...HARDWARE PACK 5 ...
Страница 14: ...Cable Loop Diagram 13 ...
Страница 16: ...DIAGRAM 8 15 ...
Страница 19: ...DIAGRAM 10 18 ...