
14
4
1
2
3
BK
BK
BL
BL
BR
BR
9
INS
TALLER
US
ER
MAINTEN
AN
CE
TECHNI
CI
AN
TECHNI
CAL
D
AT
A
3.2 WIRING DIAGRAM - BOILER CONNECTION USING ERP DIM BASE 1-RELAY BOARD.
Only use for boilers equipped with the Comando Amico Remoto
V2
remote control and the internal 1 relay board. In this case the
electrical connection of the CAR
V2
must be made directly to the
boiler as described in the relative instruction book.
Key:
M10-1 - DIM zone 1 pump
CAR
V2
- Comando Amico Remoto
V2
1 - Boiler integrated P.C.B.
2 - P.C.B. to a relay
3 - Boiler electrical connections zone
4 - 230 V ~
BK - Black
BL - Blue
BR - Brown
ERP DIM BASE
BOILER
CAR
V2