Immergas 3.025780 Скачать руководство пользователя страница 8

8

INS

TALLER

US

ER

MAINTEN

AN

CE TECHNI

CI

AN

 

Risk of damage due to corrosion caused by unsuitable 

combustion air and environment. 

 

Spray, solvents, chlorine-based detergents, paints, glue, 

ammonium compounds, powders and similar cause 

product and flue duct corrosion.

  - Check that combustion air power supply is free from 

chlorine, sulphur, powders, etc.

  - Make sure that no chemical substances are stored in the place 

of installation.

  - If you want to install the product in beauty salons, paint 

workshops, carpenter’s shop, cleaning companies or 

similar, choose a separate installation area that ensures  

combustion air supply that is free from chemical substances.

  - Make sure the combustion air is not fed from chimneys that 

were used with gas boilers or other heating devices. In fact, these 

may cause an accumulation of soot in the chimney.

Risk of material damage after using sprays and liquids 

to search for leaks

  Leak sprays and liquids clog the reference hole PR (Ref. 

4 Fig. 39) of the gas valve, damaging it irreparably.

  During installation and maintenance, do not use spray 

or liquids in the upper area of the gas valve (side refer-

ring to the electric connections)

Filling the condensate drain trap.

on first lighting of the boiler, flue gas may 

come out from the condensate drain; after 

a few minutes’ operation, check that this no lon-

ger occurs. This means that the drain trap is filled 

with condensate to the correct level preventing 

the passage of flue gas.

ATTENTION:

- type B open chamber boilers must not 

be installed in places where commer-

cial, artisan or industrial activities take place, 

which use products that may develop volatile 

vapours or substances (e.g. acid vapours, 

glues, paints, solvents, combustibles, etc.), 

as well as dusts (e.g. dust deriving from the 

working of wood, coal fines, cement, etc.), 

which may be damaging for the components 

of the appliance and jeopardise functioning.

- Unless otherwise provided for by local reg-

ulations in force, configurations B

23

 and B

53

the boilers must not be installed in bedrooms, 

bathrooms or bedsits. They must neither be 

installed in rooms containing solid fuel heat 

generators nor in rooms communicating with 

said rooms.

- The installation rooms must be permanently 

ventilated, in compliance with the local reg-

ulations in force (at least 6 cm

2

 for every kW 

of installed heat input, except in the event of 

any increases needed for electro-mechanical 

vacuum cleaners or other devices that could 

put the installation room under vacuum).

- Installation of appliances in B

23

 and B

53

 con-

figuration is recommended in non-residential 

premises and which are permanently ventilat-

ed.

ATTENTION:
failure to comply with the above implies 

personal responsibility and invalidates 

the warranty.

Содержание 3.025780

Страница 1: ...VICTRIX EXA 24 X 1 ERP IE Instruction booklet and warning Installer User Maintenance Technician 1 041695ENG...

Страница 2: ...2...

Страница 3: ...nd maintenance instructions 38 2 1 General warnings 38 2 2 Cleaning and maintenance 40 2 3 Control panel 40 2 4 Using the boiler 41 2 5 Troubleshooting 42 2 6 Information menu 44 2 7 Boiler shutdown 4...

Страница 4: ...ovide important safety indications for installation use and maintenance stages In compliance with the legislation in force the systems must be designed by qualified professionals within the dimensiona...

Страница 5: ...hazards HOT SURFACES The symbol indicates the appliance s very hot components that can cause burns SHARP SURFACES The symbol indicates the appliance s components or parts that can cause cuts if touche...

Страница 6: ...boiler if installed using the relevant terminal for air intake directly from the room in which the boiler has been installed Type C boiler if installed using concentric pipes or other types of pipes e...

Страница 7: ...ected area is one in which the boiler is not exposed to the direct ac tion of the weather rain snow hail etc This type of installation is only possible when permittedbythelawsinforceintheappliance s c...

Страница 8: ...in after a few minutes operation check that this no lon ger occurs This means that the drain trap is filled with condensate to the correct level preventing the passage of flue gas ATTENTION type B ope...

Страница 9: ...ON DISTANCES Key V Electrical connection G Gas supply RU Storage tank unit return optional MU Storage tank unit flow optional RR System filling SC Condensate drain minimum internal diameter 13 mm R Sy...

Страница 10: ...y using an accessory that is supplied on request antifreeze kit comprising two electric heating elements the relevant wir ing and a control thermostat carefully read the installation instructions cont...

Страница 11: ...tream from the pipes connecting the system to the appliance according to the manufacturer s instructions The Immergas connection unit supplied as an optional kit also includes the gas cock whose insta...

Страница 12: ...lead to the deposit of lime scale installation of the polyphosphate dispenser kit is recommended ATTENTION if the boiler is used for room central heating only without connecting an ex ternalstorageta...

Страница 13: ...blemustbeconnect ed to a 230V 10 50Hz mains supply respecting L N polarity and earth con nection this network must also have a multi pole circuit breaker with class III overvoltage category in complia...

Страница 14: ...o thermostats are connected with 2 wires only Carefully read the user and assembly instructions contained in the accessory kit ATTENTION disconnect power to the appliance be fore any electrical connec...

Страница 15: ...l probe always operates when connected regardless of the presence or type of room chrono thermostat used and can work in combination with Immergas chrono thermostats The correlation between system flo...

Страница 16: ...or allowed corresponds to the resistance encountered with the maximum allowed pipe length for each type of Terminal Kit This information allows calcula tions to be made to verify the possibility of se...

Страница 17: ...80 125 3 0 1 4 Concentric bend 45 80 125 2 1 1 Terminal complete with concentric horizontal intake exhaust 80 125 2 8 1 3 Terminal complete with concentric vertical intake exhaust 80 125 3 6 1 7 90 co...

Страница 18: ...60 100 Intake and Exhaust 16 3 m 2 5 Intake m 18 7 Exhaust m 4 9 m 7 7 Exhaust m 13 6 Concentric vertical intake exhaust terminal 60 100 Intake and Exhaust 9 m 1 4 Intake m 10 3 Exhaust m 2 7 m 4 3 Ex...

Страница 19: ...boiler taking care to insert the gasket supplied with the kit and tighten by means of the screws provided Install the upper cover fixing it using the 4 screws present in the kit positioning the releva...

Страница 20: ...cover kit includes N 1 Thermoformed cover N 1 Gasket clamping plate N 1 Gasket N 1 Gasket tightening strap N 1 Intake hole covering plate The terminal kit includes N 1 Gasket N 1 Discharge flange 80 N...

Страница 21: ...oiler flange and tighten using the screws present in the kit Fit the 60 100 3 concentric terminal pipe with the male side smooth to the female side of the bend 2 up to the end stop making sure that th...

Страница 22: ...centric terminal 60 100 3 N 1 Internal wall sealing plate 4 N 1 External wall sealing plate 5 The adaptor kit includes N 1 Gasket 1 N 1 Adaptor 80 125 2 The Kit 80 125 includes N 1 Concentric bend 80...

Страница 23: ...eached a special anti freeze kit is available that can be installed as an alternative to the standard kit Extensions for vertical kit 60 100 Fig 18 The kit with this configuration can be extended to a...

Страница 24: ...ate 3 N 1 Aluminium tile 4 N 1 Int exhaust concentric pipe 60 100 5 N 1 Fixed half shell 6 N 1 Mobile half shell 7 The adaptor kit includes N 1 Gasket 1 N 1 Adaptor 80 125 2 The Kit 80 125 includes N...

Страница 25: ...screws Fit the male side smooth to the bends 5 in the female side of the flanges 3 and 4 Fit the intake terminal 6 with the male side smooth in the female side of the bend 5 up to the end stop ensuri...

Страница 26: ...asket 2 N 1 Female intake flange 3 N 1 Female drain flange 4 N 2 Bend 90 80 5 N 1 Intake terminal 80 6 N 2 Internal wall sealing plates 7 N 1 External wall sealing plate 8 N 1 Drain pipe 80 9 to compl...

Страница 27: ...the pipes towards the boiler with a min imum slope of 1 5 Mount the cover A complete with adaptor 1 and caps 6 on the wall and assemble the flue system to the ducting system N B version 125 only befo...

Страница 28: ...00 1 90 ducted bend 60 and the roof terminal for ducting To determine the C93 flue system in configurations other than that described Fig 26 one must consider that 1 metre of ducted pipeaccordingtothe...

Страница 29: ...verage atmospheric and environmental conditions according to current regulations absence of combustion prod ucts dusts or gases that can alter the normal thermophysical or chemical conditions existenc...

Страница 30: ...nditions established by the regulations in force have been verified 1 21 FLUES CHIMNEYS CHIMNEY POTS AND TERMINALS The flues chimneys and chimney pots for the evacuation of com bustion products must b...

Страница 31: ...ntion time check activation of the main switch located upstream from the boiler and in the boiler check that the intake and or exhaust terminals if fitted are not blocked The boiler must not be starte...

Страница 32: ...event accidental modifications to lock the control panel it is necessary to press button 1 longer than 10 seconds during which the current configuration flashes the active lock is signalled by all LED...

Страница 33: ...V3 Total head available to the system with pump at speed 3 V4 Total head available to the system with pump at speed 4 A2 Power absorbed by the pump at speed 2 A3 Power absorbed by the pump at speed 3...

Страница 34: ...peration mode must be selected according to the following table Circulating pump LED Description G Y Y Y G Do not use G Y Y Y G Do not use G Y Y Y G Do not use G Y Y Y G Do not use G Y Y Y G Do not us...

Страница 35: ...W Flow rate l h Flow rate l h Head kPa Head kPa Closed bypass Open bypass Key V1 Total head available to the system with pump at speed 1 V2 Total head available to the system with pump at speed 2 V3...

Страница 36: ...penser reduces the formation of lime scale and preserves the originalheatexchangeanddomestichotwaterproductioncondi tions The boiler is prepared for application of the polyphosphate dispenser kit Rela...

Страница 37: ...ensation module 12 System expansion vessel 13 Flue probe 14 Manual air vent valve 15 Sample points air A flue gas F 16 Negative signal pressure point 17 Positive signal pressure point 18 Heat exchange...

Страница 38: ...qualified technician checks efficiency of the ducting or other devices Nevercleantheapplianceorconnectedparts with easily flammable substances Never leave containers or flammable sub stances in the s...

Страница 39: ...ches plugs door bells telephones or intercom devices in the building call an authorised company ATTENTION if you smell burning or see smoke coming out of the appliance switch it off disconnect the pow...

Страница 40: ...on button 5 Domestic hot water temperature selector 6 Central heating temperature selector 7 Boiler manometer 8 DHW production phase operating mode active 9 Boiler in block requiring unblock via RESET...

Страница 41: ...appear on the display The boiler regulation parameters can be set via the CARV2 control panel and the reset button 3 remains active on the boiler control panel along with the switch off button 1 off...

Страница 42: ...re switch fault Air flue gas pressure switch set point not reached with fan powered The boiler does not start 1 12 Storage tank probe anomaly optional If the board detects an anomaly on the boiler pro...

Страница 43: ...ntinuous flame signal This occurs if the Flame signal loss error occurs many times in a row within a preset period 38 Press the Reset button before restarting the boiler will run a post ventilation cy...

Страница 44: ...via the letter d plus the num ber of the parameter that is being displayed and the value of the parameter itself Id Parameter Description d1 Displays the flame signal uA x 10 approximate d2 Displays t...

Страница 45: ...scharge the pressure from the circuit 2 11 ANTIFREEZE PROTECTION The boiler has an antifreeze function that switches the burner on automatically when the temperature falls below 4 C standard protectio...

Страница 46: ...sulted for extraordinary maintenance contact the Authorised After Sales Service 3 2 INITIAL CHECK To commission the boiler ensure that the type of gas used corresponds to the boiler settings check con...

Страница 47: ...rial that clog condensate passage also check that the entire condensate drain circuit is clear and efficient In the event of obstructions dirt sediment etc with con sequent leakage of condensate in th...

Страница 48: ...ual air vent valve 17 Heat exchanger safety thermal fuse 18 Air sample point 19 p gas pressure point 20 Flue sample point 21 Fumes hood 22 Safety thermostat 23 Delivery probe 24 Ignition electrodes 25...

Страница 49: ...lectrode E4 Safety thermostat E13 Heat exchanger safety thermofuse G2 Igniter M1 Boiler circulator pump M20 Fan M30 Three way valve R5 Domestic hot water temperature trimmer R6 Central heating tempera...

Страница 50: ...in cap that there are no residues of material blocking the flow of condensate Noise due to air in the system Check opening of the special air vent valve cap Part 14 Fig 35 Make sure the system pressur...

Страница 51: ...minimum DHW power output maximum DHW power output minimum central heating output maximum central heating output Ignition power 3 10 CO2 ADJUSTMENT Attention the CO2 verification operations must be ca...

Страница 52: ...oten tiality to the effective heating demand of the house Therefore the boiler works normally in a variable gas pressure field between minimum and maximum power depending on the system heat load setti...

Страница 53: ...fect the correct functioning of this boiler model 0 30 sec onds 0 P2 Pump function ing The pump can function in two ways 0intermittent in winter mode the circulator is managed by the room thermostat o...

Страница 54: ...systems with motorised thermostatic valves etc it could be necessary to delay switch on with 10 step 0 600 sec onds 0 t3 Display lighting Establishes the display lighting mode 0Automatic the display l...

Страница 55: ...domestic hot water central heating phase the boiler is equipped with a function that starts the three way motorised group 24 hours after it was last in operation running it for a full cycle so as to...

Страница 56: ...e the grid 1 Front panel Fig 41 3 Remove the cover caps 3 and loosen the screws 4 4 Tilt the control panel 5 towards you Casing Fig 42 5 Remove the screws 6 that lock the front casing 7 and the two si...

Страница 57: ...WER BURNER GAS FLOW RATE PRESS BURNER NOZZLES BURNER GAS FLOW RATE PRESS BURNER NOZZLES kW kcal h m3 h mbar mm H2 O kg h g s mbar mm H2 O MAX 23 7 20382 2 56 2 29 23 4 1 88 0 52 2 88 29 4 MIN 5 5 4730...

Страница 58: ...Central heating circuit max operating pressure bar MPa 3 0 0 3 Maximum heating temperature C 90 Adjustable central heating temperature max operation field C 20 85 System expansion vessel total volume...

Страница 59: ...Number CHK Check Code PIN PIN code Type Type of installation ref CEN TR 1749 Qnw min Minimum DHW heat input Qn min Central heating minimum heat input Qnw max DHW maximum heat input Qn max Central heat...

Страница 60: ...t nominal heat output in high temper ature mode 4 88 4 At 30 of nominal heat output in a low temperature mode P1 7 8 kW At 30 of nominal heat output in a low temperature mode 1 97 0 Auxiliary electric...

Страница 61: ...sumption for the domestic hot water function AEC Annual fuel consumption for the domestic hot water function AFC Seasonal space heating energy efficiency s 92 Water heating energy efficiency wh For pr...

Страница 62: ...m the heat pump board Solar contribution and supplementary heat pump Select the lowest value Boiler and supplementary heat pump installed with low temperature heat emitters at 35 C From the board of t...

Страница 63: ...ot reflect the actual energy efficiency after installation since such efficiency is affected by additional factors such as the heat loss in the distribution system and the size of the products compare...

Страница 64: ...ad profile Solar contribution From the board of the solar device 1 I 2 1 1 x I 10 x II III I Auxiliary electricity 3 G F E D C B A A A A 27 27 27 28 27 27 27 28 30 30 30 32 33 34 35 36 36 37 38 40 39...

Страница 65: ...ate conditions Colder 0 2 x Hotter 0 4 x Stated load profile Solar contribution From the board of the solar device 1 _____ 2 1 1 x _____ 10 x _____ ____ ______ Auxiliary electricity 3 G F E D C B A A...

Страница 66: ...66...

Страница 67: ...67...

Страница 68: ...Fax 0522 680617 IMMERGAS SPA ITALY CERTIFIED COMPANY UNI EN ISO 9001 2015 Design manufacture and post sale assistance of gas boilers gas water heaters and related accessories This instruction booklet...

Отзывы: