17
Kit Description.
The Domus Container kit was designed to fit at least the installation
space for the Gaudium Solar V2, Trio V2 and Basic Magis Pro kit inside
the home (not recessed).
The lower part of the frame has levelling feet and holes necessary for
the hydraulic, gas, electrical, condensate drain and temperature control
connection.
The back of the frame is provided with special wall fixing brackets.
The upper part, completely open, is designed for the outlet to the flue
(“B type” and “C type” installations) and the intake duct (only for “C
type” installation) using the Immergas flue.
Installation operations.
Before installing the Domus Container, it is necessary to remove the front
door (1) and the fixed casing (2) by loosening the appropriate screws (3).
Release the fixed casing (2) from the stop screws on the frame by
pushing upwards and at the same time pulling it towards you.
N.B.:
to remove the front door (1) after having loosened the appropriate
screws (3), grip the handle (1a) with your left hand and the knob (1b)
with your right hand.
• Proceed by levelling the Domus Container using the provided
levelling feet (4).
• Make 4 Ø 10 mm holes on the wall in correspondence with the holes
of the brackets (5).
• Fix the Domus container on the wall using the Ø10x60 wall plugs
(6), screws (7) and nuts (8) supplies (Fig. 3).
Attention:
check that the frame remains in square during the fixing
operations.
Fig. 3
1
2
3
3
4
4
5
5
5
5
6
6
6
6
3
3
7
7
7
7
8
8
8
8
1b
1a
3
Installation drawings key:
Unique identification of the component
in the kit
Identification of the component not
supplied in this kit
1
A