Immergas 3.021452 Скачать руководство пользователя страница 3

Cod. 1.037161 - Rev. ST.000843/005

GENERAL WARNINGS.

All Immergas products are protected with suitable transport pack-

aging. 

The material must be stored in a dry place protected from the 

weather.

This instruction manual provides technical information for installing 

the Immergas kit. As for the other issues related to kit installation 

(e.g. safety at the workplace, environmental protection, accident 

prevention), it is necessary to comply with the provisions specified 

in the regulations in force and with the principles of good practice.

Improper installation or assembly of the Immergas appliance and/

or components, accessories, kits and devices can cause unexpected 

problems for people, animals and objects. Read the instructions 

provided with the product carefully to ensure proper installation.

Installation and maintenance must be performed in compliance 

with the regulations in force, according to the manufacturer's in-

structions and by professionally qualified staff, meaning staff with 

specific technical skills in the plant sector, as envisioned by the law.

DESCRIPTION.

This kit allows connecting a probe on the domestic cold water 

inlet pipe of the boiler to prevent unnecessary ignitions in systems 

with water heating through solar systems or alternative sources.
The boiler will not turn on if the inlet water is sufficiently hot.
The reading of the DHW inlet probe is signalled on the display 

by the symbol (

) lighting up. For further information and on 

how to set the boiler, see the relative instruction book.

Fig. 1

IE

MODELS:
VICTRIX TT SERIES 

(Fig. 1)

VICTRIX TERA - TERA V2 

(Fig. 1)

VICTRIX TERA VIP 

(Fig. 1)

MAIOR KW 

(Fig. 1)

VICTRIX EXA 

(Fig. 1)

VICTRIX HYBRID 

(Fig. 1)

KIT COMPOSITION.

Ref

Kit components description

Qty

1 DHW inlet NTC probe

1

2 Connection wiring

1

- Wiring clips

2

ASSEMBLY.

-  Remove voltage to the boiler.

-  Disassemble the bottom protective grid.

-  Install the DHW inlet probe (1) on the domestic cold water inlet 

pipe (3).

-  Make sure the pipe on which the probe is installed is made of 

copper

-  Connect the wiring fastons (2) to the probe (1).

-  Got to the electrical connection compartment.

-  Connect the wires to the terminal block as indicated in the 

boiler instruction book, making sure to feed the wires through 

the specific space designed.

-  Clamp the new wires to the cables in the boiler with the supplied 

clips.

-  Close the connection compartment, refit the bottom protective 

grid and restore power to the boiler to bring it back to normal 

operating conditions.

SOLAR INLET PROBE KIT

COD. 3.021452

1

2

3

Содержание 3.021452

Страница 1: ...o acqua fredda sanitaria della caldaia per prevenire inutili accensioni in impianti dotati di riscaldamento dell acqua attraverso sistemi solari o fonti alternative Nel caso in cui l acqua in ingresso sia sufficientemente calda la caldaia non si accende La rilevazione della sonda ingresso sanitario viene segnalata dal display mediante l accensione del simbolo per maggiori informazioni e per come i...

Страница 2: ...ere al vano allacciamento elettrico Collegare il cablaggio alla scheda elettronica o alla morsettiera come indicato nel libretto istruzioni della caldaia avendo cura di far passare i cavi nell apposito spazio predisposto Fascettare il nuovo cablaggio ai cavi presenti in caldaia con le fascette in dotazione Chiudere il vano allacciamento chiudere il cruscotto se presente rimontare la griglia inferi...

Страница 3: ...of the boiler to prevent unnecessary ignitions in systems with water heating through solar systems or alternative sources The boiler will not turn on if the inlet water is sufficiently hot The reading of the DHW inlet probe is signalled on the display by the symbol lighting up For further information and on how to set the boiler see the relative instruction book Fig 1 IE MODELS VICTRIX TT SERIES F...

Страница 4: ... the electrical connection compartment Connect the wires to the P C B and to the terminal block as indicated in the boiler instruction book making sure to feed the wires through the specific space designed Clamp the new wires to the cables in the boiler with the supplied clips Close the connection compartment close the control panel included refit the bottom protective grid and restore power to th...

Отзывы: