background image

Buschjost GmbH 

Detmolder Str. 256

D-32545 Bad Oeynhausen
Box 10 02 52-53

D-32502 Bad Oeynhausen
Phone: +49 (0) 57 31/7 91-0

Fax: +49 (0) 57 31/79 11 79

www.imi-precision.com 

[email protected]

EN1377027BA

8

10/2018

 15 

 Replacing complete valve

1. Unmount the valve as described in chapter  

14

 “Decommissioning”.

2. Mount the new valve as described in chapter  

 7 

 “Assembly”.

3. Connect solenoid as described in chapter  

 8 

 “Connect solenoid electrically”.

 16 

 Trouble shooting

 

Observe safety information and instructions 

in chapter 

12

 “Maintenance”.

Error table

not working
Possible cause: 

The control voltage must be 

>90% of its nominal value.

Remedy:

 Measure the control voltage directly in 

front of the solenoid. If the operating voltage is 

lower or a long cable is used, a heavier conductor 

must be chosen to keep the voltage drop small.

possible cause: 

Solenoid coil defective,  

 

 

        no continuity

Remedy:

 Replace solenoid

impaired function
Possible cause:

 Diaphragm soiled

Remedy:

 Control bore in the diaphragm

Possible cause:

 Core jammed

Remedy:

 Clean core and core tube

Possible cause:

 Valve seat leaking

Remedy:

 Clean control bores

inadmissible operating conditions
Possible cause:

 Operating pressure excessive

Remedy:

 Check maximum operating pressure and 

reduce pressure accordingly.

 17 

 Return

1. Unmount the valve as described in chapter  

14

 “Decommissioning”.

2. Save the “goods return declaration” form  – 

PDF file available online at:  

http://www.buschjost.com/service/ 

other-documents/goods-return-declaration/

3. Fill out the goods return declaration and  

fulfill the requirements.

4. 

!

 

CAUTION

 Consider the weight of the  

valve in the choice of packaging.

5. Enclose the printed goods return declaration 

in the parcel.

 18 

 Disposal

1. Unmount the valve as described in chapter  

14

 “Decommissioning”.

2. Dismantle valve parts to enable reusable 

materials to be recycled.

3. Dispose of valve parts as appropriate for 

their materials:  

Material

Way of disposal

Valve body, valve 

cover, diaphragm, 

o-rings

similar category to 

domestic refuse 

industrial waste

Solenoid  

(copper wire)

Electrical waste

 19 

 Directives and certificates

Note to Pressure Equipment Directive (PED)

The valves of series 84070 and 84080 corres-

pond to Article 4 § 3 of the Pressure Equip-

ment Directive 

2014/68/EU

 (PED). This means 

that these valves are designed and manufactu-

red in line to the good engineering practice.
The CE-sign at the valve refers not to the 

PED. Thus the declaration of conformity is not 

longer applicable for this directive.

Notes on EEC Directive

The valves shall be provided with an elec-

trical circuit which ensures the limits of the 

harmonized standards EN 61000-6-3 and 

EN 61000-6-1 are observed, and hence the 

requirements of the Electromagnetic Compa-

tibility Guideline 

2014/30/EU

 satisfied. The 

CE-marking is related to this EU-requirements.

NSF certificate

A2

This valve is tested and certified

as a component by NSF International

against NSF/ANSI Standard 42

for materials and structural

integrity requirements only.

Содержание Buschjost 84070 Series

Страница 1: ...2 preset order of instructions 1 part number according to part list 1 flexible part number section q replace spare part DANGER WARNING CAUTION NOTICE embedded safety message given limits or fixed val...

Страница 2: ...ng electri cal engineering hydraulic und pneumatic Trained specialists must be authorized to commission ground and designate devices systems and power circuits according to the standards of safety tec...

Страница 3: ...s deli very packaging Take valve out of the packaging immedia tely prior to assembly prolonged storage at 10 C to 20 C Avoid during transport mechanical loads falling off tipping over damages to the e...

Страница 4: ...with operating limits Ensure to comply with the operating limits pri or to mounting the valve Observe the valve s data sheet Planning of the pipe system Buschjost recommends to include manual stop val...

Страница 5: ...figuration of the socket insert y Protective earth PE 7 Terminal 1 8 Terminal 2 3 Attach the other wires to the terminals 7 and 8 of the socket insert 5 DANGER Ensure correct polarity while connecting...

Страница 6: ...o increase the pressure slowly After each test depressurize the valve outlet first Test for internal tightness 1 Close the valve solenoid of NC valves de energized NO valves energized 2 Flood the valv...

Страница 7: ...eplace the o ring 12 that is situated in the valve cover 6 4 12 11 Replace o rings 3 Screw the core tube 10 on valve cover 4 tighten only hand tight Spare parts related to the valve body Replace the u...

Страница 8: ...ile available online at http www buschjost com service other documents goods return declaration 3 Fill out the goods return declaration and fulfill the requirements 4 CAUTION Consider the weight of th...

Отзывы: