background image

6

10/2018

EN1377027BA

 11 

 Operation

 NOTICE 

Thermal destruction of AC solenoids

Operating AC solenoids in unmounted 

state will cause them to burn out.

 

Do not operate AC voltage solenoids 

without being mounted above core tube 

with core.

Actuate valve periodically

 

NOTICE

 Actuate the valve at least 

once a 

month

 to prevent functional parts getting 

blocked. 

 12 

 Maintenance

Maintenance work must only be carried out by 

qualified personnel (refer to section 

1.8

).

info

 

Deposits of the medium, dirt par-

ticles, aged or worn out seals may lead  

to malfunctions.

 

Individually determine as the operator ap-

plication specific maintenance intervals.

 12.1 

 Cleaning and visual inspection

 

Periodically clean the valve and perform a 

visual inspection at the same time.

1. 

!

 

DANGER

 Disconnect the solenoid from 

power supply.

2. 

!

 

CAUTION

 Leave the solenoid to cool 

down.

3. Clean the outside of the valve and check for:

 

tightness of cover screws

 

firmly sealing of cable gland,

 

Damages and leakages.

 12.2 

 Checking for tightness and strength

 NOTICE 

Risk of damaging the valve

Invalid test conditions may lead to damage 

of the valve.

 

Do not exceed the maximum operating 

pressure during the test for internal tight-

ness (valve seat closed).

 

The test for strength and external leakage 

(valve seat opened) according to EN12266 

is permitted with maximum 1.5 times of 

the nominal pressure rating (PN) at room 

temperature.

 

The valve must not be operated during 

these tests.

 

Ensure to increase the pressure slowly.

 

After each test, depressurize the valve 

outlet first.

Test for internal tightness

1. Close the valve (solenoid of NC valves 

de-energized; NO valves energized).

2. Flood the valve.

3. Gradually pressurize up to the maximum 

operating pressure. There must no fluid 

escape.

Test for strength and external leackage

1. Open the valve (solenoid of NC valves ener-

gized; NO valves de-energized).

2. Flood the valve.

3. Gradually pressurize maximum up to 1.5 

times of the nominal pressure rating (PN) at 

room temperature.

4. Apply soap sud to the outer sealing edges 

and check for the formation of bubbles. 

There must no bubbles appear.

1

1

Check sealing edges

 12.3 

 Preparing maintenance

1. 

!

 

DANGER

 Disconnect the solenoid from 

power supply.

2. 

!

 

WARNING

 Depressurize the pipe system.

3. 

!

 

CAUTION

 Leave the solenoid to cool 

down.

 Component overview

3

4

1

5

2

External components

7

6

9

11

10

12

8

Internal components

 1 

Solenoid with device socket

 2 

Fixing clamp

 3 

Valve cover

 4 

Valve body

 5 

Fixing screws

 6 

Diaphragm*

 7 

Compression spring*

 8 

Compression spring inside core*

 9 

Core*

 10 

Core tube

 11 

O-ring

 12 

O-ring

 12.4 

 Dismantling valve

Unmount solenoid

 

Slightly bend back spring clip 

 2 

  and pull 

Click-on

®

 solenoid 

 1 

 upwards.

1

2

Unmount solenoid 9101

Dismantle core tube

  Tool: wrench size 27 for 1502 

1. Loosen the core tube at its 

screw piece 

 2 

.

2. Take off core tube together 

with spring clip. Take care 

for the loose core 

 9 

 and the 

compression spring 

 8 

.

Dismantle valve cover

1. Loosen fixing screws 

 5 

 (Torx M4) at the 

valve cover 

 4 

.

5

Loosen fixing screws

2. Take off valve cover 

 4 

.

3. Take off compression spring 

 7 

 and  

diaphragm 

 6 

 from valve seat.

2

Содержание Buschjost 84070 Series

Страница 1: ...2 preset order of instructions 1 part number according to part list 1 flexible part number section q replace spare part DANGER WARNING CAUTION NOTICE embedded safety message given limits or fixed val...

Страница 2: ...ng electri cal engineering hydraulic und pneumatic Trained specialists must be authorized to commission ground and designate devices systems and power circuits according to the standards of safety tec...

Страница 3: ...s deli very packaging Take valve out of the packaging immedia tely prior to assembly prolonged storage at 10 C to 20 C Avoid during transport mechanical loads falling off tipping over damages to the e...

Страница 4: ...with operating limits Ensure to comply with the operating limits pri or to mounting the valve Observe the valve s data sheet Planning of the pipe system Buschjost recommends to include manual stop val...

Страница 5: ...figuration of the socket insert y Protective earth PE 7 Terminal 1 8 Terminal 2 3 Attach the other wires to the terminals 7 and 8 of the socket insert 5 DANGER Ensure correct polarity while connecting...

Страница 6: ...o increase the pressure slowly After each test depressurize the valve outlet first Test for internal tightness 1 Close the valve solenoid of NC valves de energized NO valves energized 2 Flood the valv...

Страница 7: ...eplace the o ring 12 that is situated in the valve cover 6 4 12 11 Replace o rings 3 Screw the core tube 10 on valve cover 4 tighten only hand tight Spare parts related to the valve body Replace the u...

Страница 8: ...ile available online at http www buschjost com service other documents goods return declaration 3 Fill out the goods return declaration and fulfill the requirements 4 CAUTION Consider the weight of th...

Отзывы: