KOINE 4/5 

THERMAL CUTOUT PROTECTION:

- The electric motors are protected against overload by

thermal magnetic cutouts, the activation of which is displayed 
by illumination of the red lamp (ref.1h). In this case, after the 

PRWRUVKDYHFRROHGWKHVSHFL¿FSHUVRQQHOVKRXOGRSHQWKH

electrical panel and reset the cutouts.
For  the  mortar  pump  motor  (ref.12)  there  is  an  additional 
safety protection: a thermal sensor shuts down the machine 
in the event of a motor temperature overload. 

12. OPERATION

- The  hopper  safety  grille  must  be 

¿WWHGDQGVHFXUHG

at all times. 
Never place materials other than premixed dry materials in 
the hopper. 

 - Opening of the mixing chamber causes shutdown of the

PDFKLQHPRYLQJSDUWV¿J)LUVWFORVHWKHPL[LQJFKDPEHU

and press the start pushbutton to start the machine.

:HDUVSHFL¿HGSURWHFWLYHGHYLFHVEHIRUHZRUNLQJRQ

the machine

 FIG.11

FIG.10

Regulate the water to obtain the required consistency.

'LIIHUHQWGLDPHWHUVRIGHÀHFWRUDUHDYDLODEOHPP

WKHVPDOOHUGHÀHFWRUVHQDEOHLPSURYHGQHEXOLVDWLRQDQGWKHODUJHU

ones are more suited to materials with a larger particle size.

)RUVWDQGDUGSODVWHULQJPDWHULDOVWKHGHÀHFWRUZLWKPPKROH

(ref.9b) is used.
However,  it  is  important  to  measure  the  distance  of  the  nozzle 
(ref.9c) from the outlet so that it is the same as the diameter of 

WKHGHÀHFWRU¿J

If no water is delivered, the machine shuts down.
Before restarting the machine, identify the cause of the problem: 

YDOYHFORVHGGHOLYHU\KRVHEHQWWDQNHPSW\FORJJHG¿OWHUUHI

Interruptions exceeding 30min should be avoided.

Содержание KOINE 4

Страница 1: ...PLASTERING MACHINE Operating maintenance spare parts manual 3223425 R18 2018 09 KOINE 4 5...

Страница 2: ...VALVE 4c FLOW METER 4d WATER PRESSURE SWITCH 4e PRESSURE REDUCER 5 ELECTRICAL PANEL 5a COMPRESSOR PRESSURE SWITCH 5b MACHINE PRESSURE SWITCH 6 DIAPHRAGM COMPRESSOR 6a RELIEF VALVE COMPRESSOR 7 CELL WH...

Страница 3: ...ompatible with this type of machine by the material manu facturers gypsum based plasters anhydrite based plasters lime cement based plasters reverse insulation plasters grouting mortar etc 4 1 PLASTER...

Страница 4: ...d Use lifting equipment suited to the overall weight of the machine indicated in table 1 To facilitate transport the machine can be disassembled as VKRZQ LQ J FIG 4 7KH ZHLJKW RI WKH VXE XQLWV VKRZQ L...

Страница 5: ...ine starts up Check that the water pressure does not fall below 2 5 bar otherwise activate the ZDWHU SXPS 8VH WKH PLFURPHWULF YDOYH WR UHJXODWH WKH ZDWHU RZ UDWH GLVSOD HG RQ WKH RZ PHWHU UHI ZLWK UHV...

Страница 6: ...r causes shutdown of the PDFKLQH PRYLQJ SDUWV J LUVW FORVH WKH PL LQJ FKDPEHU and press the start pushbutton to start the machine HDU VSHFL HG SURWHFWLYH GHYLFHV EHIRUH ZRUNLQJ RQ the machine FIG 11 F...

Страница 7: ...te a worn pump To replace the pump proceed as follows release the handle on the left and open the mixing chamber Insert the tube wrench on the end of the mixer and unscrew until the screw inside the s...

Страница 8: ...formed exclusively by specialised personnel Use exclusively original IMER spare parts which must not EH PRGL HG LQ DQ ZD If any guards are removed for repairs ensure they are UH WWHG FRUUHFWO DW WKH H...

Страница 9: ...9 IMER INTERNATIONAL S p A KOINE 4 5...

Страница 10: ...10 IMER INTERNATIONAL S p A KOINE 4 5 INDICATOR LAMP TABLE...

Отзывы: