background image

 

Page

Electric connection 

The device is planned for the connection at 240/400 (see rating plate). Mounting a norm 
coupler according to the rating plate. 
At a substitution of the 

connecting cable

 the back wall (Dissolution of 4 screws) is to be 

removed; the terminal is then 

accessible

. If a direct connection is requested onto the mains, a 

single-pole counter with a minimum contact gap of 3 mm, according to the valid 

norms

, is 

necessary. The yellow-green earthing must not be disturbed. Always a 

connecting cable

 is to 

be employed, which one is constant for temperatures about 50 ° C or so one of the model 

H05

 

RR

 F

 

Before the bonding make sure that: 

 

1.  the incoming line sufficiently is protected, 
2.  the socket according to the rules is grounded, 
3.  the coupler or combined the single-pole counter is correctly with the device. 

 
The insulation material in the stove and fat residues from the production develop smoke and 
unpleasant odours. Therefore we recommend during the first 

use

 to warm up the stove with 

opened door for approximately 30 minutes on the maximum temperature stage. 
 
We refuse every liability if the safety norms are not kept. 
 

Connection diagram 

 

L1

 

N

 

E

 

240 volt 

 

 

L1

 

L2

 

L3

 

N

 

E

400 volt 

 

Placement 

 
To a slightly inflammable wall the device must have a distance of 2 cm. If placement of this 
device in close distance of walls, partitions, kitchen furniture, decorative linings and so forth, 
it is recommended that these are produced from not inflammable material, otherwise 

they

 

must be dressed up with characterized not inflammable material. The most precise 
observation of the rules of the fire protection  must be guaranteed. 

Содержание HL 10 OF E

Страница 1: ...OPERATING MANUAL CONVECTION OVENS ...

Страница 2: ...Page1 Device Article number Type Part number Hurrican I 02990 Hurrican II 02991 Tornado 02992 HL 5 OF E 02993 HL 6 OF E 02994 HL 10 OF E 02995 ...

Страница 3: ...of contents Page 2 Preface Page 3 Electric connection Page 3 Placement Page 4 Initiation Page 5 Technical dates inserting temperatures service Page 5 Maintenance and cleaning Page 6 Guarantee assurance Page 8 Notes on safety Page 9 ...

Страница 4: ...vation of the valid rules The manufacturer rejects any responsibility to a bad function through erroneous installation Remark According to international rules when connecting the device a set up has to be established which allows to separate the device with a contact gap width of at least 3 mm all pole from the net LS switches protections and floodgates are regarded as suitable separators Potentia...

Страница 5: ... to the rules is grounded 3 the coupler or combined the single pole counter is correctly with the device The insulation material in the stove and fat residues from the production develop smoke and unpleasant odours Therefore we recommend during the first use to warm up the stove with opened door for approximately 30 minutes on the maximum temperature stage We refuse every liability if the safety n...

Страница 6: ...hat Technical dates inserting temperatures Type WDH Connected load Accessories Hurrican I 595 x 565 x 565 mm 2 5 kilowatt 240 for 4 sheet steels 435 x 345 mm Hurrican II 595 x 565 x 565 mm 2 5 kilowatt 240 for 4 sheet steels 435 x 345 mm in addition to with upper heat Tornado 795 x 730 x 600 mm 5 0 kilowatt 400 for 4 sheet steels 600 x 400 mm HL 5 OF E 850 x 717 x 650 mm 5 7 kilowatt 400 for 5 she...

Страница 7: ...rough dissolution of the left screwing mother the wing clears and can be removed after dissolution of the three screws of the flange mounted motor Switching units They are accessible after the wrapper and the instrument panel were removed Seals In order to transpose the seals the wrapper is to be removed to loosen the 4 screws of the seal channel then by means of a screwdriver through the puncture...

Страница 8: ...eather cloth Scope of delivery Hurrican I Carrying out in high grade steel with moisturizing system Water fixing connection Hurrican II Carrying out in high grade steel with moisturizing system Water fixing connection an upper heat is additional installed Tornado Carrying out in high grade steel with moisturizing system Water fixing connection HL 5 OF E HL 6 OF E HL 10 OF E Carrying out with manua...

Страница 9: ...scribed tension as well as at perfect voltage ratios correct service as well as installed in conformity to regulations from which Operating manual clear maintenance expert installation through a licensed electrician the usually presupposed or explicitly guaranteed services and functions are filled We point out explicitly that the measurements indicated in our brochures or catalogues services or fu...

Страница 10: ...is device is exclusively suitable for the warming and baking of foods Case of fault Power resp gas pipe supply to be interrupted through main power switches or for example protection etc power plug and or disturbing main cock Do not start device under no circumstances again if device or incoming lines show damages or the reason for malfunction is unclear in this case the device must not be used be...

Отзывы: