IMC LGYF-2000BX Скачать руководство пользователя страница 5

 
 

                                                                                                            INTERNATIONAL MACHIINE CONCEPTS

 

                                                                                             

       

capacitors.   

   5.5      The  requirements  of  induction  machine  sealing  for  selection  of  the  sensing 

membrane and the bottle cap: 

 

(1)        The material of used sensing membrane must be the same as that 

of the sealed bottle.   

(2)        The optimum thickness range of foil on the sensing membrane is 

between 0.012 and 0.03mm. For the sensing membrane with the 

aluminum  foil  being  less  than  0.012mm  in  thickness,  sealing 

speed and quality are not guaranteed.   

(3)        The  vacuum  aluminum  plating  composite  membrane  similar  to 

aluminum foil induction membrane must not used.   

(4)        When using the sensing membrane without paper pad, the bottle 

mouth and cap must be smooth and without deformation.   

(5)        It  is  not  applicable  to  non-threaded  object  sealing  using  the 

cover,  as  the  cover  can  not  completely  press  the  sensing 

membrane  flatly  and  tightly,  resulting  in  the  phenomenon  of 

loose sealing closure.   

 

     
6.      Operation steps 

 

6.1    Turn on the power switch (look at whether the voltage is normal), start the cooling fan, 

delay for 5 seconds and make the main circuit work, press the seal switch to make the seal 

work.   

          Note:  it  is  prohibited  to  continuously  and  rapidly  switch  on  and  off  the  power 

supply and seal switch! Wait for at least 5 seconds after turning off the power switch, 

then re-open the power supply, or else, it would be easy to damage the equipment.   

6.2     Adjust the sensing head to make it higher than the sealed object by 1 to 3mm. Place the 

sealed objects on both ends of the sensor head, and check whether the sensor head and the 

conveyor belt are parallel. If not parallel, adjust the pillar below the conveyor belt to make 

it parallel.   

6.3     According to the bottle diameter, select the sealing range of the sensor head.   

6.4     Press down the sealing switch, and try sealing. If the sealing is  not  firm,  reduce 

the speed of conveyor belt. If the sealing membrane is burnt, increase 

the conveyor speed or increase the sensor head. After the requirements 

on sealing quality are met, continuous automatic sealing operation can 

start.   

6.5    To  ensure  that  the  seal  will  be  always  in  the  best  working  condition, 

Содержание LGYF-2000BX

Страница 1: ...INTERNATIONAL MACHIINE CONCEPTS Model LGYF 2000BX Air Cooled Continuous Electromagnetic Induction Sealing Machine Please read the manual carefully before use Operation Manual...

Страница 2: ...components Also through improvements withyearsofaccumulatedproductionexperienceandexploration itnowhasdevelopedand produced Model LGYF 2000 Series electromagnetic induction sealingmachine which has ma...

Страница 3: ...ake speed adjustment in a timelymanner inordertoachievethebestsealingquality In this machine the height of sensor head adopts electric adjustment capable of sealingtheobjectswithintherangeof40to400mmi...

Страница 4: ...ee phase outlet for grounding but a safe and reliable grounding wire should have connected separately to ensure safe use of electricity andthenswitchonthepower 5 2 The cross sectional area for power c...

Страница 5: ...onsteps 6 1 Turn on the power switch look at whether the voltage is normal start the cooling fan delayfor5secondsandmakethemaincircuitwork pressthesealswitchtomaketheseal work Note it is prohibited to...

Страница 6: ...mperature drops to the normal state the equipment will automatically start the sealing operation 7 Maintenance and repair 7 1 The machine is electromechanical integration equipment In order to avoid t...

Страница 7: ...nt shall request the Company or the local dealer to issue equipment warranty card and keep them in proper custody as the future warrantycertificate 9 Notunderwarrantyresponsibility 9 1 Thereisnowarran...

Страница 8: ...pipe 10A 3 4 Hexagon wrench 6 8 1 Each 5 Screwdriver 4 Cross 1 6 Machine Test Bottle 40 20 7 Operation Manual 1 8 Ex factory Certificate 1 9 Warranty Card Triple sheets 1 Note The above are essential...

Страница 9: ...at protection circuit Power voltmeter Start up delay circuit Over current protection circuit Rectifier filter Speed control Circuit on conveyor belt Inverter circuit air cooled PLL Control circuit Sen...

Страница 10: ...0 U8E 1 2 U8A 3 4 U8B D13 C18 15V 5 6 U6C D 9 Q 13 CK 11 Q 12 R 10 S 8 U4B D15 Q8 15V 13 12 U6F D 5 Q 1 CK 3 Q 2 R 4 S 6 U4A Q6 10 9 8 U7C 12 13 14 U7D 5 6 7 U7B 15V D9 C17 C19 C16 S1 15V S3 R63 C20 1...

Отзывы: