IMB MB2002B-BS-FT7010 Скачать руководство пользователя страница 1

网衬机

Pocket Facing Sewing Machine

(MB2002B-BS-FT7010)

使用说明书

Instruction Manual

常州智谷机电科技有限公司

CHANGZHOU WISDOM & VALLEY ELECTRICAL TECHNOLOGY CO.,LTD

在使用本设备之前请先阅读本使用说明书

Please read the operation manual of the touch

screen interface before using the device

请将本使用说明书放在便于查阅的地方保管

Please keep this operation manual of touch screen

interface in convenient place

for reference

2022.04.03

版本信息/ Version

Содержание MB2002B-BS-FT7010

Страница 1: ...Manual CHANGZHOU WISDOM VALLEY ELECTRICAL TECHNOLOGY CO LTD Please read the operation manual of the touch screen interface before using the device Please keep this operation manual of touch screen int...

Страница 2: ...IMB No part of this manual may be copied or transcribed without requesting prior authorization from IMB The contents of this manual may be subject to change without advance notification We are happy t...

Страница 3: ...ENGLISH...

Страница 4: ...bugging method 6 5 1 Suction trimming 6 5 2 Turnover plate 6 6 Operating instructions 8 6 1 Preparation before operation 8 6 2 Operation process description 8 6 2 1 Boot device 8 6 2 2 Sewing 8 6 2 3...

Страница 5: ...1 1 Basic information of equipment 1 BS FT7010 head 2 Switch 3 Control box 4 Turnover device 5 Pedal 6 Suction 7 Stacker 1 7 3 2 4 6 5...

Страница 6: ...2002B Pocket Facing Sewing Machine 1 Machine head BS FT7010 0388M 2 Maximum sewing speed rpm 4500 3 Working voltage V 220 4 Working air pressure Mpa 0 4 0 5 5 Work efficiency 5s 6 Equipment size mm 14...

Страница 7: ...rs when the sewing machine moves up and down or returns to its original position 7 When the sewing machine is running please do not cut off the power or air supply 8 In order to prevent accidents caus...

Страница 8: ...t the air cylinder clamp the finger when putting the finger in the folding machine WARNING Improper operation of the machine may cause personal injury Please read this instruction carefully and operat...

Страница 9: ...on 1 Power switch press the power switch to 1 and the equipment is powered on and ventilated 2 Foot pedal the foot pedal is lifted when the foot pedal is stepped back and sewed when the foot pedal is...

Страница 10: ...fabric should be pushed forward for a certain distance and the thread should be tied to the air inlet 5 2 Turnover plate 1 Turnover conditions the cloth leaves the reflective paper step on the foot p...

Страница 11: ...regulating valve c Precautions to ensure that the cloth falls flat in the receiving box the cloth shall be manually delivered to the top of the turnover plate after sewing as shown in the figure belo...

Страница 12: ...the barometer to make it meet the requirements of the machine 6 2 Operation process description 6 2 1 Boot device 4 1 1 Press the power switch to 1 and the equipment is powered on and ventilated 6 2...

Страница 13: ...Electrical wiring 7 1 Signal borad 2002B PORT Specifications Reset status Magnet switch IN1 3P OFF Switch IN2 3P OFF Solenoid valve OT1 2P OFF Dust valve OT2 2P OFF Pedal 1 INA1 3P OFF Pedal 2 JI01 6P...

Страница 14: ...10 8 Accessories box details NO ITEM QTY 1 Operation manual 1 2 Parts Manual 1 3 Touch screen interface operation instructions 1 4 Head attachment 1...

Страница 15: ...e and parts 2 Cleaning up oil pollution Clean the greasy dirt on the table board needle board and shuttle core 3 Pressboard sponge Check whether the sponge is worn or deformed and replace it if it is...

Страница 16: ...and are protected by national intellectual property laws and regulations Without the written permission of the right holder the patented technology of the achievement shall not be implemented and the...

Отзывы: