VMG-14+ Hardware Setup Guide
36
CHAPTER 3
Physical
Installation
This chapter provides the necessary information for installing the Selenio VMG into a rack and
applying power. Please read this entire chapter before beginning the installation procedure.
Successful completion of this installation readies the system for the initial configuration.
In
This
Chapter:
•
in next section.
•
“Electrostatic Discharge (ESD) Prevention” on page 39
•
“Unpacking and Inspection” on page 39
.
•
“Installation Instructions” on page 40
.
Site
Preparation
Imagine Communications recommends that the VMG operations site be prepared as described in the
following topics:
Tools
and
Equipment
The installation guidelines in this manual use the following tools, which you should provide at your
installation site.
•
3/8” box wrench, socket wrench, or nut driver to attach cables to the DC PEM.
•
5/16” screwdriver and suitable screws to rack mount the chassis.
•
Cable ties and cable clamps to secure power cords and signal cables.
•
An anti-static pad or treatment if installing on vinyl composite tile, linoleum, or carpet.
Site
Equipment
The installation guidelines in this manual require the following equipment at the operations site:
•
An equipment rack: EIA compliant 19”:
-
The rack must be accessible from the front and rear for installation.
-
Ensure that any stabilizers that came with the equipment rack have been installed before
mounting the chassis in the rack.
-
“Rack Requirements” on page 37
•
For DC power:
•
in next section.
•
“Site Space Requirements” on page 37
•
•
“Rack Requirements” on page 37
.
•
.
•