HUC6800
+
Installation and Operation Manual
11
Chapter 2: Installation
Unpacking the Module
Preparing the Product for Installation
Before you install the HUC6800
+
and HUC6800
+
C, perform the
following:
•
Check the equipment for any visible damage that may have
occurred during transit.
•
Confirm receipt of all items on the packing list. See
below for more information.
•
Remove the anti-static shipping pouch, if present, and all other
packaging material.
•
Retain the original packaging materials for possible re-use.
See
“Unpacking/Shipping Information” on page ix
for information
about returning a product for servicing.
Checking the Packing List
Note
Contact your customer service
representative if parts are
missing or damaged.
Table 2-3.
Available Product Packages
Ordered Product
Content Description
HUC6800
+
or
HUC6800
+
C module
• One front module
• One back connector
•
One
HUC6800
+
and HUC6800
+
C Broadcast
Upconverters Installation and Operation
Manual
Содержание Selenio 6800 HUC6800
Страница 3: ...Edition A July 2006 HUC6800 and HUC6800 C Broadcast Upconverters Installation and Operation Manual...
Страница 4: ......
Страница 8: ...vi HUC6800 Installation and Operation Manual Contents...
Страница 22: ...8 HUC6800 Installation and Operation Manual Chapter 1 Introduction...
Страница 36: ...22 HUC6800 Installation and Operation Manual Chapter 2 Installation...
Страница 70: ...56 HUC6800 Installation and Operation Manual Chapter 4 Specifications...
Страница 78: ...64 HUC6800 Installation and Operation Manual Appendix A Communication and Control Troubleshooting Tips...
Страница 82: ...68 HUC6800 Installation and Operation Manual Index...
Страница 83: ......