Installation
& Set Up
Section 2
14
Controls Diagram
CONNECTING THE GROUND AND WELD CABLES
GROUND AND WELD CABLE
1. Line up the key (item 1) on the connector on the end of the ground cable with the key way (item 2).
2. Push the connector into the receptacle until the rubber of the connector meets the housing of the receptacle.
3. Turn the connector clockwise until it stops.
Repeat with the weld cable. To remove, reverse the steps above.
CONTROL CABLE
4. Line up the key (item 3) on the connector on the end of the gun control cable with the key way (item 4).
5. Push the connector into the receptacle until the threads of the connector meet the threads of the receptacle.
6. Thread the connector clockwise until it stops. Finger tight is sufficient. DO NOT OVER TIGHTEN.
To remove, reverse the steps above.
Key
Key
Key way
Weld & Ground Cable Connections
Key way
Control Cable Connections
Содержание QuikLinx SW750
Страница 9: ...Safety Precautions Section 1 8 Symbols and Definitions...
Страница 29: ...210 200 205 209 201 202 203 204 206 214 208 211 212 213 213 207 Exploded Diagram Section 7 28 Figure 2...
Страница 30: ...300 301 302 303 304 305 306 307 308 Section 2 Section 7 Exploded Diagram 29 Figure 3...
Страница 32: ...Section 2 Section 7 Exploded Diagram 31 503 500 501 502 Figure 5...
Страница 33: ...Exploded Diagram Section 7 32 600 601 608 607 603 606 605 604 609 610 602 605 605 605 Figure 6...
Страница 36: ...Please visit us on the web www imageindustries com twitter studwelding...