background image

Note

:

Legs can be shared by two 

cab

i

nets, see the 

i

nstruct

i

ons. Place the

corner cab

i

net aga

i

nst the wall so that

i

ts back edge 

i

s rest

i

ng on the support

board. Through the holes at the top
back corners of the cab

i

net, mark where

to dr

i

ll for the f

ixi

ng screw. Set the cab-

i

net as

i

de. Note

:

If there

´

s no corner

cab

i

net,

i

nstall the cab

i

net that w

i

ll f

i

t

aga

i

nst the back and s

i

de walls,

allow

i

ng the f

i

ller space shown on your

plan.

3. Secure the suppor

t board

Al

i

gn the top edge of the support board

w

i

th the level l

i

ne you marked at 4 

5

/

16

.

Secure 

i

t to the studs. Should the end of

the support board fall between studs,
secure 

i

t to the wall w

i

th a heavy-duty

anchor.

2. Cut base cabinet suppor

t boards

Measure the length of the base and

h

i

gh cab

i

nets to be 

i

nstalled. Do not

i

nclude the wall space beh

i

nd appl

i

-

ances. Cut the base cab

i

net support

board 

i

nto measured lengths. Cut the

board 1 

1

/

2

shorter where a s

i

de toek

i

ck

i

s planned.

9. Drill thr

ough the cabinet walls

F

or all doors e

x

cept UL

R

IKSDAL use a

3

/

16

" dr

i

ll b

i

t to dr

i

ll through the fourth

holes from the top and bottom edges.
For UL

R

IKSDAL door, dr

i

ll through the

second holes from the top/bottom. When

i

nstall

i

ng a drawer cab

i

net, dr

i

ll

through the f

i

fth hole from the top.

8. Install the next base cabinet

Mark,

dr

i

ll, and 

i

nsert the screws for

the ne

x

t cab

i

net. L

i

ft the cab

i

net 

i

nto

place, carefully al

i

gn

i

ng  

i

t w

i

th the

prev

i

ous cab

i

net and secur

i

ng them

together w

i

th a clamp.

7. Secure the cabinet to the wall

T

i

ghten the screws

, but not completely.

Assure that the cab

i

net 

i

s level front-to-

back and s

i

de-to-s

i

de. H

i

nt

:

Install

i

ng

the LAZY SUSAN

i

s eas

i

er now than

after the countertops are 

i

n place.

6. Install the corner cabinet

L

i

ft the corner cab

i

net bac

i

nto place

and ad

j

ust the legs so that 

i

t stands

level.

5. Drill, anchor and screw

Us

i

ng the appropr

i

ate dr

i

ll b

i

t and type

of screw for your wall mater

i

al, dr

i

ll

holes at the spots you’ve marked. If
there’s no stud,

i

nsert a heavy-duty

anchor then the screw and t

i

ghten

halfway.

12. Tighten all the screws

When all base cab

i

nets ha

ve been

mounted and al

i

gned, t

i

ghten all screws

i

nto the wall. Now the h

i

gh cab

i

net 

i

s

i

n place, make the f

i

nal ad

j

ustments to

the wall cab

i

nets and t

i

ghten all the

screws.

11. Install the high cabinet

The h

i

gh cab

i

net should be 

i

nstalled

the same way you 

i

nstalled the base

cab

i

nets. If you

´

re us

i

ng a cover panel

on one s

i

de, mount th

i

s before 

i

nstall-

i

ng the cab

i

net us

i

ng the enclosed

i

nstruct

i

ons

10. Fasten cabinets together

Place the connect

i

on screws enc

losed

w

i

th the cab

i

net frames 

i

nto the holes

and t

i

ghten. Cont

i

nue 

i

n th

i

s fash

i

on

w

i

th the rema

i

n

i

ng base cab

i

nets

Step 4. Install the base and high cabinets

Hang these

instructions on 

the wall so you’ll 

have your 

hands free

When you’ve completed Step 4,

all of the cab

i

net frames w

i

ll be 

i

n place.

18. The finishing touch

Dab your f

i

nger 

i

nto a 3-

i

n-1 o

i

l to pre

-

vent the caulk from st

i

ck

i

ng, then run

your f

i

nger along the caulk, forc

i

ng 

i

t

i

nto the crev

i

ce.

R

emove the tape for an

a

i

rt

i

ght seal and a stra

i

ght edge.

17. Prepare the area to be caulked

T

o produce an a

i

rt

i

ght seal between the

wall and the cab

i

net, you’ll need to

caulk around the f

i

ller p

i

eces. Choose a

well made late

x

 brand (

i

t doesn’t need

to be waterproof.) Tape alongs

i

de the

area to be caulked. Apply a bead of
caulk 

i

nto the crev

i

ce.

15. Install filler pieces 

Put the f

i

ller p

i

ece 

i

n place w

i

th the cut

edge aga

i

nst the wall. Attach by dr

i

ll

i

ng

a screw through the predr

i

lled holes

from the 

i

ns

i

de of the cab

i

net. Install

other f

i

ller p

i

eces 

i

n the same way.

When you’ve f

i

n

i

shed 

i

nstall

i

ng all

f

i

ller p

i

eces, go to p

i

cture 17.

Cut the template mater

i

al so that 

i

t’s

the same he

i

ght as the cab

i

net. Hold 

i

t

i

n place where the f

i

ller w

i

ll be

i

nstalled. Open the compass a couple of

i

nches and place the po

i

nt aga

i

nst the

wall. Hold

i

ng the compass hor

i

zontal

and level, follow the l

i

ne of the wall so

that the penc

i

l traces a clear l

i

ne on the

template. To cut the template to the cor-
rect w

i

dth, measure the d

i

stance from

the farthest po

i

nt on the wall to the cab-

i

net. F

i

nd the same po

i

nt on the tem-

plate and mark 

i

t. Draw a stra

i

ght l

i

ne

from th

i

s po

i

nt to the top and bottom of

the template to form the flat edge that
w

i

ll f

i

t aga

i

nst the cab

i

net. Cut the tem-

plate and check that 

i

t f

i

ts, then trace

the shape onto the fller and follow the
cutt

i

ng d

i

rect

i

ons 

i

n p

i

cture 14.

16. If the wall is uneven

If the w

all 

i

s not level and flat, the f

i

ller

must be cut to conform to the wall’s
shape. To do th

i

s, you’ll need to make a

template for trac

i

ng the wall’s shape

onto the f

i

ller. A p

i

ece of th

i

n plywood or

heavy cardboard makes a su

i

table tem-

plate. You’ll also need a measur

i

ng tape,

penc

i

l and compass.

© Inter IKEA Systems B.V

. 2004.

Ne

x

t,

i

t’s t

i

me for the base and h

i

gh 

cab

i

nets. Before you beg

i

n, note all plumb-

i

ng, power sources and other ut

i

l

i

t

i

es.

Measure these locat

i

ons carefully, and,

us

i

ng a hole saw, cut the appropr

i

ate

open

i

ngs before each cab

i

net 

i

i

nstalled.

In the follow

i

ng steps, you’ll 

i

nstall

the legs at the front of the cab

i

nets, and

secure a cab

i

net support board to the wall.

Th

i

i

s a length of part

i

cleboard packed

together w

i

th the toe-k

i

ck panels. If you

prefer, you can use legs on the back of the
cab

i

nets 

i

n l

i

eu of the support board.

4. Star

t with the corner cabinet

Attac

h legs to the front edges of the

cab

i

nets accord

i

ng to package 

i

nstruc-

t

i

ons. If you are not us

i

ng the support

board, attach back legs as well.
Always use a back leg at the end of the
run, as th

i

s makes attach

i

ng the s

i

de

toe-k

i

ck eas

i

er.

14. Cut filler pieces

W

i

th a handsaw

:

draw a l

i

ne connect

i

ng

the top and bottom marks on the front
s

i

de of the f

i

ller, and cut 

i

t w

i

th the face

s

i

de up. J

i

gsaw

:

mark both s

i

des of the

f

i

ller. Put mask

i

ng tape over the l

i

ne on

the front s

i

de to prevent ch

i

pp

i

ng. Cut

i

t from the back s

i

de.

1. Marking the level lines

Us

i

ng the h

i

gh po

i

nt of the floor that

you marked earl

i

er, measure up 4 

5

/

16

.

Use a 4 foot level to draw a l

i

ne on the

wall at th

i

s he

i

ght. Now measure 34 

1

/

2

from the same po

i

nt on the floor and

draw another level l

i

ne. Th

i

s w

i

ll help

you level the top of the base cab

i

nets.

13. Measure filler pieces

Chec

k the wall w

i

th your level to see 

i

f

i

i

s even and flat. If so, measure the

d

i

stance from the wall to the cab

i

net

and mark th

i

s d

i

stance at the top and

bottom of the f

i

ller p

i

ece. Note

:

If the

wall 

i

s uneven, sk

i

p to p

i

cture 16

.

Содержание Akurum kitchen

Страница 1: ...INSTALLATION GUIDE FOR YOUR AKURUM KITCHEN...

Страница 2: ...process step by step The posters provide a hands free way to reference detailed installation instructions while you work We have also creat ed a Kitchen Installation video available at any IKEA store...

Страница 3: ...install cabinets Jig saw for sawing holes for the sink and the extractor fan Clamps Right angle square FIXA 35 mm hole cutter to drill extra holes for the tap in the sink if necessary Mitre box with...

Страница 4: ...jor problems need to be fixed you may want to hire a professional Marking cabinet position Measure and draw in the postion of your cabi nets on the wall so you can be sure everything fits Mapping out...

Страница 5: ...u purchased a solid wood countertop from IKEA be sure to store it in or near the kitchen This allows it to adjust to room temperature Assembling wall cabinets Follow the instructions included in each...

Страница 6: ...the rail goes up 6 Cut the susp ension rail Mea sure the leng th of the wall cabinets to be installed alon g one wall Include the leng th of wall behi nd a high cabinet only if the high cabinet is 12...

Страница 7: ...id e of the cabinet Install othe r filler pieces in the same way Whe n you ve finis hed installin g all filler pieces go to pictu re 17 Cut the temp late material so that it s the same heig ht as the...

Страница 8: ...terto p from IKEA was pretreated at the facto ry to cond i tion and protect it until installat ion To prep are it for use sand the surface with a fine sand pape r and finis h it with IKEA BEH AND LA...

Страница 9: ...ts oppo site the hing e side 2 Install ligh ting If cabinet lighting is inclu ded in your kitch en plan we sugg est that you install it now Use a qual ified elect ricia n for profes sional resu lts 5...

Страница 10: ...Install ligh ting If cabinet lighting is inclu ded in your kitch en plan we sugg est that you install it now Use a qual ified elect ricia n for profes sional resu lts 5 Atta ch drawer fron ts Usin g t...

Страница 11: ...s and wood surfaces with a soft damp cloth using cleaning products intended for these materials After cleaning wipe down with a clean dry cloth DO NOT use cleaning agents that contain ammonia alcohol...

Страница 12: ...be done after the high cabi net is installed to ensure that every thing is level 14 Tighten the mounting screws When all wall cabinets have been mounted aligned and connected and final adjustments hav...

Страница 13: ...airtight seal between the wall and the cabinet you ll need to caulk around the filler pieces Choose a well made latex brand it doesn t need to be waterproof Tape alongside the area to be caulked Apply...

Страница 14: ...operly 6 Seal the sink cutout To prevent moisture from penetrating the countertop apply a polyurethane seal along the cut edges with a paint brush 5 Saw the sink hole Place the countertop on sawhorses...

Страница 15: ...realigned holes These holes and the hardware allow easy adjustment for perfect drawer front alignment The cabinets have predrilled holes for quick and easy installation of shelving drawers and interio...

Страница 16: ...Inter IKEA Systems B V 2004 Congratulations on your new IKEA Kitchen and on the money you saved...

Отзывы: