![IHP CHAROAK35 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/ihp/charoak35/charoak35_installation-instructions-manual_623416005.webp)
5
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Figure 17 - Place log #1
Figure 18 - Place log #2
1
2
5
Figure 19 - Place log #3
5. 40” Models
- The front right log (3) butts up against the grate as
shown in
Figures 19.
45”
Models
- Align the notch on the bottom of the front right log
(3) over the front right locating tab. See
Figures 16 and 19
.
6.
Position the top front right log (4), as shown in
Figure 20
on the
landing outlined in
Figure 19
.
Figure 20 - Place log #4
4
Pin for Log #5
3
Landing for Log #4
Figure 21 - Place log #5
7.
Position the Top Front Left Log (5), shown in
Figure 21
on the pin
outlined in
Figure 20
.
f i r e - p a r t s . c o m