
OPERATION
IC75 ENG
3-19
Lifting the machine
WARNING
•
ALWAYS lift the machine on the level ground.
•
NEVER lift the machine loaded with any personnel.
•
Make sure the lifting cables and other lifting devices are strong enough to support the
machine.
•
Use guide or tag lines to prevent the machine from swinging or turning.
Weight on lifting the machine: 10300 kg
1. Prepare strong enough wire ropes, shackles, sling frame and sling jigs.
2. Fix the sling jigs at the positions of the crawler frame shown above and pass the wire
rope through them.
3. Install the wire rope to the sling frame with the shackle.
4. Install the wire rope to the crane hooks and lift upward so the crawler is a little bit above
the ground, then stop lifting.
5. If the balance is good continue slowing lifting the machine.
Shackle
Sling jig
Shackle
Sling jig
Sling frame
Pipe
Содержание IC75
Страница 1: ...OPERATION MANUAL IC75 SERIAL NUMBER CA003001 PUB 1 1007...
Страница 2: ......
Страница 6: ...IC75 ENG...
Страница 10: ...IC75 ENG...
Страница 26: ...SAFETY IC75 ENG 1 16 This page is intentionally left blank...
Страница 28: ...IC75 ENG...
Страница 42: ...IC75 ENG...
Страница 62: ...OPERATION IC75 ENG 3 20 This page is intentionally left blank...
Страница 64: ...IC75 ENG...
Страница 96: ...MAINTENANCE IC75 ENG 4 32 Electrical wiring system diagram INSTRUMENT PANEL...
Страница 102: ...MAINTENANCE IC75 ENG 4 38 This page is intentionally left blank...
Страница 103: ...IC75 ENG SPECIFICATIONS...
Страница 104: ...IC75 ENG...