background image

User Manual

Monitoring

7.1 Registration&Create a New Plant
Users can go to SOLARMAN Business Web/APP to check plant data and plant running status.
APP: Scan the QR code below to download SOLARMAN Business APP or go to Google Play/App Store and search
SOLARMAN Business to download.
Web: Domain name of platform: https://pro.solarmanpv.com/

Step 1: Open a browser and go to

https://Pro.solarmanpv.com/

or go to SOLARMAN Business APP.Click

Register

SOLARMAN Homepage

Содержание LP-2

Страница 1: ...Manual for Pro Logger Model LP 2 IGEN Tech Co Ltd Add Block F4 China IoT International Innovation Park No 200 Linghu Avenue Wuxi Jiangsu P R China Tel 86 400 181 0512 Email info solarmanpv com Website...

Страница 2: ...stem monitoring which is capable of receiving and executing network scheduling command The product can sends the data to the monitoring platform via 4G or LAN The real time status and historical data...

Страница 3: ...User Manual Picture Size L mm W mm H mm Material 240 118 49 PC...

Страница 4: ...95 No Condensation Light 4 power status alarm com Press 1 Reset Reload Memory 128MByte NAND FLASH 1MByte SRAM Extended Memory 8GByte TF card Size 240mm 118mm 49mm IP Grade IP20 Installation Method DIN...

Страница 5: ...Ethernet Ethernet 10 100M adaptive RJ45 max communication distance 100m 4 USB 1 mini USB USB2 0 protocol 60MBps max conductor length 5m 5 Reload Reset Reboot Press for 3s Restore factory settings Pre...

Страница 6: ...re stripper Multiple use meter Side cutter plier Slotted screwdriver Electrical tape Expansion screw Adjustable spanner Laptop Mesh port required Position 1 Pro logger is not waterproof only can be in...

Страница 7: ...User Manual Step 1 Connect power output of air switch and power input L N interface of power module via cable...

Страница 8: ...2 via cable Step 3 Connect RS485 interface according to actual situation One 485 interface can connect to 32 devices at max Step 4 Connect the Ethernet cable to LP 2 please use shielded twisted pair o...

Страница 9: ...tep 5 Install logger antenna Step 6 Make sure the air switch is at opening status and connect to AC power Step 7 Close air switch and check logger indicator lights Ethernet Install the antenna Air Swi...

Страница 10: ...ace to inverter via 485 com line Connect to multiple inverters Pro logger can connect to multiple inverters via hand in hand connection The max number of devices on each line is 32 If users want to co...

Страница 11: ...to go to configuration page Mobile COM Parameter Settings Modify APN and server direction according to the requirement Ethernet Parameter Settings Ethernet Data Transmission Work Mode Transmission Mod...

Страница 12: ...t Mode DHCP Disabled Set IP address and click Save Serial Port Parameter Settings Scenario 1 Connect to single device If the address is 1 please enter 1 1 Scenario 2 Connect to multiple devices e g 20...

Страница 13: ...lant running status APP Scan the QR code below to download SOLARMAN Business APP or go to Google Play App Store and search SOLARMAN Business to download Web Domain name of platform https pro solarmanp...

Страница 14: ...here Step 3 Go to a target plant click Add in the upper right corner select Gateway Logger and enter device SN here 7 2 Data Checking Users can go to SOLAMMAN Business Web APP to check plant data Typ...

Страница 15: ...er Manual Contact IGEN Tech Co Ltd Add Block F4 China IoT International Innovation Park No 200 Linghu Avenue Wuxi Jiangsu P R China Tel 86 400 181 0512 Email info solarmanpv com Website www solarman c...

Отзывы: