16
8.2 Procedure
•
Pierce or pull out cable feedthrough (6) and feed connection cable through.
Check supply voltage. See name plate for allowable voltage. Use shielded
connection cable to the electrode 2 x 2 STP, e.g. LIHF/GLS,
4 x 0.75 mm².
•
Length of connecting line max. 100 m at 5 – 10,000 µS/cm or max. 30 m at
0.5 – 2,000 µS/cm.
•
Only connect shielding on the SMLC1 control unit (terminal 6). After electrical
connection - with device disconnected from the mains - put hood (7) on
holder (5) and tighten fastening screws (3).
(see sketch p. 7)
8.3 Testing
Switch on supply voltage, the green LED
"U
B
”
lights up.
•
When the electrode is uncovered the red LED lights up “
FAULT”.
•
When the electrode is submerged the LED “
FAULT”
must not light up.
•
The LED
"TEST"
must light up for one second every two minutes.
A successful test is confirmed by the red LED flashing briefly.
9. Technical data
9.1 Device data
Component
TÜV ID: 000006173
CE ID no.: 0035
Manufacture in accordance with EC Directive 97/23/EC,
Modules B+D, Category IV, EC type test W 17/02,
Applied standards:
Control device: DIN EN 50081-1, DIN EN 50082-1
Electrode TRD, AD2000, ASME boiler
230 V ± 15%
Mains connection
50/60 Hz
Power consumption
approx. 4.5 VA
Device fuse
80 mA/T
Protection in accordance with DIN VDE 0470
IP 40*
Allowable ambient temperature
0 - 60°C
* IP 54 protection class is to be ensured in the boiler area to comply with the German regulation
VdTÜV-Wasserstand 100, 4.90.