5.3.2 Procedure 

 

Connect according to wiring diagram (5.3.1). 

 

Pierce or pull out cable feedthrough and feed connection cable through. 

 

Check supply voltage. See name plate for permissible voltage. 

 

Use  a  shielded  connection  cable  for  the  probe:  e.g.  LIYCY  min.  0.75  mm²  up  to  a  max. 
length of 50 m.  LIYCY min. 1.5 m² up to a max. length of 100 m (see note). 

 

Use a shielded cable for the current output (see note).  

 

Only connect shielding on the FLB1 control unit (terminal 12). 

 

After connecting to the power supply – with the device disconnected – place the hood on 
the base and tighten the fastening screws. 

 

Fit  electrode  according  to  separate  assembly  instructions  and  connect  as  in  the  wiring 
diagram. 

 

When  installing  it,  check  whether  the  cables  used  are  UV-resistant  and  that  UV 
protection is ensured on the installation side if necessary. 
The cable must not come into contact with heat-conducting parts. 

 
For aligning the probe plug to the local circumstances, the upper nut can be released (

 33.5mm). 

In doing so, take care not to move the plug in the probe!! (SW24). 
The contact carrier can be carefully turned into the correct position. 
On refitting ensure that the seal is correctly seated! Retighten the upper nut without moving the 
plug in the probe. 
 
 

The connector plugs must be wired according to the wiring diagram. 

 

 

Caution

 

Содержание FLB1

Страница 1: ...Conductivity limiter FLB1 for use with the level probes EL 18 or EL22 or EL23 D 08 B 39272 EN 0 doc Edition10 2017...

Страница 2: ...your plant in particular in the steam and condensate sector We take care of both the modernization of steam boilers that are equipped with mature mechanical technology and of new systems that are oper...

Страница 3: ...Function 6 5 Design and installation FLB1 6 5 1 Installation dimensions and descriptions 6 5 2 Installation 7 5 3 Electrical connection 7 5 3 1 Wiring diagram 8 5 3 2 Procedure 9 6 Fitting the probe 1...

Страница 4: ...o these documents at all times If this device is passed on to third parties these installation and operating instructions in the relevant language of the country must accompany it Read and observe the...

Страница 5: ...ck Caution hot This symbol and signal word refer to a potentially hazardous situation where extremely severe burns and scalds may be suffered over the whole body Caution This symbol and signal word re...

Страница 6: ...TDS limiter FLB1 is used for continuous monitoring of the conductivity of liquids The conductivity is measured using a measuring cell This consists of a special conductivity electrode and tank wall o...

Страница 7: ...here are malfunctions of the system e g due to power failure or a short circuit the evaluation unit reacts as if the conductivity has exceeded the limit value The warning light U B indicates that the...

Страница 8: ...DIN rail adapter Drill the marked points in the base with a 4 3 mm drill Fit base on base plate with 2 M4 screws Connect to power supply see Section 5 3 5 3 Electrical connection The device terminal...

Страница 9: ...5 3 1 Wiring diagram Probe plug 1 Electrode rod 2 GND 3 GND Back plate Safety chain 8...

Страница 10: ...and tighten the fastening screws Fit electrode according to separate assembly instructions and connect as in the wiring diagram When installing it check whether the cables used are UV resistant and th...

Страница 11: ...probe Unscrew the probe plug Clean and check sealing surfaces Insert new sealing ring Grease the thread with heat resistant solid lubricant e g graphite Screw in and tighten the probe max tightening...

Страница 12: ...tally into the boiler as standard using a T piece This enables the concentrated water which is measured to be directly discharged In order to determine the length note that there should be a free spac...

Страница 13: ...6 2 EL23 This probe is fitted as standard using a protective tube 12...

Страница 14: ...6 3 EL18 This probe is fitted as standard using a flange in a pipe With intermittent flow a measurement can then be carried out and TDS reduction can be started 13...

Страница 15: ...the electrode lower the water level in the boiler or empty the measuring line Connect the multimeter to the 3 6 mm jack socket 8 or to the terminals 6 and 7 and set a current of 4 mA with the potentio...

Страница 16: ...the calculated current via the potentiometer Z Then carry out the calibration again as described under points 5 1 5 2 and 5 3 If in spite of following the above steps calibration is not possible the f...

Страница 17: ...75 CE identification number 0035 Power supply 230 V 10 50 60 Hz Power consumption approx 4 5 VA Device fuse 80 mA T Protection type as per DIN EN 60529 IP 40 All ambient temperature 0 60 C in accordan...

Страница 18: ...d are not subject to warranty IGEMA GmbH Antwerpener Str 1 D 48163 M nster Germany Tel 49 25 01 9 24 24 0 Fax 49 25 01 9 24 24 99 info igema com www igema com This high quality IGEMA product has been...

Отзывы: