MAINTENANCE

HPRS  Series

Chapter 5

MAINTENANCE

5.1 Preventive Maintenance

The 

HPRS

 Decade Substituter is packaged in a ven-

tilated case.  If it is maintained in a generally clean 
or air-conditioned environment, cleaning will seldom  
be necessary.  In a contaminated atmosphere, cleaning 
may be required.

To maintain optimal accuracy and stability, it is best 
not to open the case of the unit.  In normal service, 
the switches require no additional lubrication.  Dur-
ing the manufacturing process, a light lubrication is 
applied which in most instances is suffi

  cient for the 

service life of the switches, and yet will not tend to 
collect dust.

5.2 Verifi cation of Performance

5.2.1 Calibration Interval

The HPRS Series instruments should be verifi ed for 
performance at a calibration interval of twelve (12) 
months.  This procedure may be carried out by the 
user, if a calibration capability, is available, by IET 
Labs, or by a certifi ed calibration laboratory.  If the 
user should choose to perform this procedure, then 
the considerations below should be observed.

5.2.2 General Considerations

It is important, whenever testing the 

HPRS

 Series 

Decade Units, to be very aware of the capabilities 
and limitations of the test instruments used.  There 
are a some bridges and direct reading resistance me-

ters or digital multimeters available that can verify 
the accuracy of these units, 

especially

 when used in 

conjunction with standards that can serve to confi rm 
or improve the accuracy of the testing instrument.

Such instruments would have to be 

signifi cantly 

more 

accurate than the specifi ed accuracies for all appli-
cable ranges, in order to perform this task, allowing 
for a band of uncertainty of the instrument itself.  A 
few commercial models, bridges and meters, do exist 
that can do this; consult IET Labs for information.

It is important to allow both the testing instrument 
and the HPRS Substituter to stabilize for a number of 
hours at the nominal operating temperature of 23

0

C, 

and at < 50% RH.  There should be no temperature 
gradients across the unit under test.

Proper  metrology  practices  should  be  followed  in 
performing this verifi cation.

5.2.3  Procedure

1.  Confi rm the zero resistance of the unit.

2.  Determine  the  allowable  upper  and  lower 

limits for each resistance setting of each de-
cade following the specifi ed accuracy given 
in the Specifi cations Section of Chapter 2.

3.  Confi rm that the resistances fall within these 

limits.

4.  If any resistances fall outside these limits, the 

associated switch assembly may be trimmed, 
repaired or replaced.

Содержание HPRS Series

Страница 1: ...info ietlabs com TEL 516 334 5959 FAX 516 334 5988 www ietlabs com IET LABS INC Copyright 2018 IET Labs Inc Visit www ietlabs com for manual revision updates HPRS im Sept 2018 HPRS SERIES High Power...

Страница 2: ...Email info ietlabs com TEL 516 334 5959 FAX 516 334 5988 www ietlabs com IET LABS INC...

Страница 3: ...placed at no charge when returned to IET Changes in this product not approved by IET or application of voltages or currents greater than those allowed by the speci cations shall void this warranty IET...

Страница 4: ...4 HRRS Series Revision History Date Description By March 2013 Initial release LB Sept 2018 Major update for standardization of marking and required information in the manual BB...

Страница 5: ...ategory I or it is not marked with a measurement category its measurement terminals must not be connected to line voltage mains and it is not designed for use as for measurements within measurement ca...

Страница 6: ...nent replacement and internal adjustments must be made by quali ed maintenance personnel only DO NOT substitute parts or modify the instrument There are no user serviceable parts inside Refer servicin...

Страница 7: ...45 V ARE USED TAKE ALL MEASURES TO AVOID ACCIDENTAL CONTACT WITH ANY LIVE COMPONENTS USE MAXIMUM INSULATION AND MINIMIZE THE USE OF BARE CONDUCTORS WHEN USING THIS INSTRUMENT Use extreme caution when...

Страница 8: ...trical Considerations 13 4 4 Dial Setting 13 4 5 Environmental Conditions 13 Chapter 5 MAINTENANCE 14 5 1 Preventive Maintenance 14 5 2Veri cation of Performance 14 5 2 1 Calibration Interval 14 5 2 2...

Страница 9: ...on of meters and instru ments HPRS instruments are useful development tools wherever precise resistances with high power handling capacity are required It is important to keep the amount of time power...

Страница 10: ...99 99 k 7 0 01 HPRS F 7 0 1 999 999 9 k 7 0 1 HPRS F 7 1 9 999 999 M 7 1 HPRS F 0 001 99 999 999 k 8 0 001 HPRS F 8 0 01 999 999 99 k 8 0 01 HPRS F 8 0 1 HPRS 200W 9 999 999 9 M 8 0 1 For 0 5 accuracy...

Страница 11: ...Zero Resistance 5 m per decade Terminals Two five way binding posts and one ground post electrically connected to case HPRS SERIES HIGH POWER DECADE RESISTANCE SUBSTITUTER WARNING Observe all safety...

Страница 12: ...pping of the instrument should become necessary 3 2 Installation For a rack mounted model installation in a 19 inch rack may be made using the slots in the rack mounting ears A mounting location that...

Страница 13: ...30 C Power Time on Time o 101 W continuous none 101 W 5 minutes 10 minutes Exceeding the time on can cause damage to the resis tors If continuous use is required to full rated power see DRS 900 High P...

Страница 14: ...apabilities and limitations of the test instruments used There are a some bridges and direct reading resistance me ters or digital multimeters available that can verify the accuracy of these units esp...

Страница 15: ...emove a decade switch assembly proceed as follows 1 Label and unsolder the bus wires connecting the switch assembly to the resistive loads 2 Loosen the screw holding the knob on the switch shaft and r...

Страница 16: ...rranty will be repaired at no charge For any questions on repair costs or shipment instruc tions please contact our Service Department at the above number or visit www ietlabs com to request an RMA on...

Страница 17: ...17 MAINTENANCE HPRS Series Figure 5 1 HPRS Series Schematic Diagram...

Отзывы: