background image

 

RACK-3200G QIG                         IEI Technology Corp. 

           Page  1 

 
 

 

RACK-3200G 

4U Rackmount Chassis 

Version: 1.0

 

 

Quick Installation Guide

 

ABOUT THE RACK-3200G 

The 4U, metal RACK-3200G AT/ATX compatible rackmount 
industrial chassis is designed to operate reliably in industrial 
environments where it will be exposed to dust, wide temperature 
variations, and shocks and vibrations, among other things. 

 

SPECIFICATIONS 

 

Form Factor: 

Standard 4U, 19” wide

 

 

SBC Form Factor:

 Full-size, slot CPU cards

 

 

Construction:

 Metal 

 

Slots Number:

 20-slot

 

 

Cooling: 

4 x 8cm fans

 

 

Drive Bays: 

6 x 5.25” Optical drives 

1 x 3.5” FDD (floppy disk drive) 

 

Dimensions (DxWxH): 

674mm x 431mm x 176mm 

 

Operating Temperature: 

0~40°C

 

 

Relative Humidity: 

5~95%

 

 

Vibration: 

5-17Hz, 0.1” double amplitude displacement 

17-640Hz, 1.5G acceleration peak to peak 

 

Shock: 

10G acceleration peak to peak 

 

 

PACKING LIST 

When you unpack the chassis, make sure the following items have 
been shipped. 
 

 

1 x Quick Installation Guide 

 

1 x Power cord 

 

2 x Handles and handle plates 

 

1 x Screw set 

 

2 x Keys 

 

DETAILS OF INCLUDED SCREWS 

The attached screw set includes five types of screws. Screws used 
for chassis installation are shown below. 

 

 

   

 

1              2                3              4              5 

Peripherals/Parts 

Screw Label (refer to 
the picture above) 

5.25” Optical Drives 

3.5” FDD 

3.5” HDD 

2.5” HDD 

Power Supply Unit 

Rackmount Bracket 


Backplane 

Table 1: 

Screws for Peripheral/Parts 

 

Содержание RACK-3200G

Страница 1: ...loppy disk drive Dimensions DxWxH o 674mm x 431mm x 176mm Operating Temperature 0 40 C Relative Humidity 5 95 Vibration o 5 17Hz 0 1 double amplitude displacement o 17 640Hz 1 5G acceleration peak to...

Страница 2: ...RACK 3200G QIG IEI Technology Corp Page 2 DIMENSION DRAWING The dimensions of RACK 3200G are shown below Figure 1 Dimension Drawing measurement units millimeter...

Страница 3: ...3200G chassis The handles are installed on the sides at the front of the chassis Each handle is secured to the chassis by four retention screws To install the handles please follow the steps below Ste...

Страница 4: ...stall the PSU Compatible IEI PSUs are listed in the table above NOTE RACK 3200G PSU installation is a complicated process Before you proceed with the installation of the PSU please read all the instal...

Страница 5: ...e Figure 10 Remove Two Side Retention Screws and Loosen Two Top Retention Screws Figure 11 Run the Cable through the Right Hole underneath the PSU Bracket Step 8 Insert the PSU into the bracket Make s...

Страница 6: ...copper pillars Step 3 Once the backplane is properly aligned with the retention screw holes secure the backplane to the chassis with 15 retention screws Figure 17 Secure the Backplane to the Chassis S...

Страница 7: ...the drive bracket retention screw s from the front panel The right side drive bracket has two front panel retention screws The left side drive bracket has one front panel retention screw Figure 20 Dri...

Страница 8: ...ey must first be mounted on separately purchased HDD brackets The HDD brackets are accessory items Step 1 Position the HDD onto the HDD bracket Make sure the PCB board of the HDD faces the bottom of t...

Страница 9: ...over the chassis and reinsert the eight previously removed retention screws Chassis Maintenance Fan Replacement NOTE Please ensure the power of the computer is switched off before fan replacement proc...

Страница 10: ...ep 0 Cabinet Installation Supporting rails rack trays or slide rails can be implemented using the mounting holes on the sides of the chassis The eight mounting holes in the two handles on the sides of...

Отзывы: