IRS-100-ULT3 Railway Surveillance System
Page 51
Î
Hyper-threading [Enabled]
Use the
Hyper-threading
option to enable or disable the CPU hyper threading function.
Î
Disabled
Disables the use of hyper threading technology
Î
Enabled
D
EFAULT
Enables the use of hyper threading technology
Î
Active Processor Cores [All]
Use the
Active Processor Cores
option to enable numbers of cores in the processor
package.
Î
All
D
EFAULT
Enable all cores in the processor package.
Î
1
Enable one core in the processor package.
Î
Intel
®
Virtualization Technology [Enabled]
Use the
Intel
®
Virtualization Technology
option to enable or disable virtualization on the
system. When combined with third party software, Intel
®
Virtualization technology allows
several OSs to run on the same system at the same time.
Î
Disabled
Disables Intel
®
Virtualization Technology.
Î
Enabled D
EFAULT
Enables Intel
®
Virtualization Technology.
Î
Intel
®
SpeedStep™ [Enabled]
Use the
Intel
®
SpeedStep™
option to enable or disable the Intel
®
SpeedStep
Technology.
Î
Disabled
Disables the Intel
®
SpeedStep Technology.
Î
Enabled D
EFAULT
Enables the Intel
®
SpeedStep Technology.
Содержание IRS-100-ULT3
Страница 14: ...IRS 100 ULT3 Railway Surveillance System Page 1 Chapter 1 1 Introduction ...
Страница 21: ...IRS 100 ULT3 Railway Surveillance System Page 8 Chapter 2 2 Unpacking ...
Страница 25: ...IRS 100 ULT3 Railway Surveillance System Page 12 Chapter 3 3 Installation ...
Страница 48: ...IRS 100 ULT3 Railway Surveillance System Page 35 Chapter 4 4 BIOS ...
Страница 80: ...IRS 100 ULT3 Railway Surveillance System Page 67 Chapter 5 5 Maintenance ...
Страница 84: ...IRS 100 ULT3 Railway Surveillance System Page 71 Chapter 6 6 Interface Connectors ...
Страница 86: ...IRS 100 ULT3 Railway Surveillance System Page 73 Figure 6 2 Main Board Layout Diagram Solder Side ...
Страница 94: ...IRS 100 ULT3 Railway Surveillance System Page 81 Appendix A A Regulatory Compliance ...
Страница 98: ...IRS 100 ULT3 Railway Surveillance System Page 85 Appendix B B Safety Precautions ...
Страница 103: ...IRS 100 ULT3 Railway Surveillance System Page 90 Appendix C C Watchdog Timer ...
Страница 106: ...IRS 100 ULT3 Railway Surveillance System Page 93 Appendix D D Hazardous Materials Disclosure ...