Innovative DisplayWorks
G-10f/GCG-10f
6
PREPARATION PRIOR TO OPERATION
•
Remove all packaging materials before using cooler.
This includes: foam pedestal, adhesive tape (used to fix accessories) and protective gaskets.
•
Inspect cooler for concealed damage. Immediately file a claim with the freight carrier if there is damage.
IDW is not responsible for damage incurred during shipping.
•
For proper operation, place the cooler on a dry, level surface.
•
Clean the interior surface with a soft cloth and lukewarm water before operation.
•
Keep cooler in an upright position for 30 minutes prior to use.
•
IDW requires that a sole use circuit be dedicated for the unit. Failure to do so voids warranty.
WARNING: Do not use extension cords.
WARNING: Compressor warranties are void if compressor burns out due to low voltage.
WARNING: Power supply cord should not be removed or altered in any way.
Leveling
•
Set unit in its final location, making certain there is adequate ventilation in the room.
WARNING: Warranty is void if ventilation is insufficient.
•
Proper leveling of the G-10f/GCG-10f cooler is critical to it operating correctly. Condensation removal and
door operation will be affected by leveling.
<
The cooler should be leveled front to back and side to side with a level.
•
Ensure that drain hose or hoses are positioned in the pan.
•
Remove plug and cord from inside the lower rear of the cooler.
•
The unit should be placed close enough to the electrical supply so that extension
cords are never used.
Shelving Installation
• Securely insert shelf clips into pilasters
• Shelf clips should be level so shelf lays fl at
•
Place shelf on shelf clips
(Maximum load per shelf is 30kg)
Содержание G-10
Страница 16: ...Instruction Manual 15 G 10f ELECTRICAL WIRING DIAGRAM TRANSFORMER START CAPACITOR CONDENSER UNIT SOCKET ...
Страница 18: ...Instruction Manual 17 GCG 10f ELECTRICAL WIRING DIAGRAM TRANSFORMER START CAPACITOR CONDENSER UNIT SOCKET ...
Страница 19: ...Innovative DisplayWorks G 10f GCG 10f ...