background image

 

 
 

 

 

 

ZSSC4151Evaluation Kit Start-Up Guide       

© 2016 Integrated Device Technology, Inc. 

10 

March 11, 2016 

4.  Turn the red knob on the Sensor Replacement Board fully counterclockwise. Select the “P1” field and 

click the “Acquire Data” button (see Figure 3.2). 

5.  Turn the red knob on the Sensor Replacement Board fully clockwise. Select the “P2” field and click the 

“Acquire Data” button. 

6.  Click the Calculate button. The coefficients for the calibration will be calibrated and updated in the 

calibration formula textbox at the bottom of the window. HINT: Scroll to the bottom of the textbox so that 
the “Output” button appears. Move the cursor over the “Output” button. A popup window will appear 
showing the complete set of calibration coefficients. 

7.  Click the “Write Coefficients To NVM” button. This will download the updated coefficients to the NVM of 

the ZSSC4151. 

Figure 3.2   Using the Calibration Window Tab to Acquire Data and Calculate Coefficients  

7

6

5

4

 

 

Содержание ZSSC4151

Страница 1: ...structions contained in this manual and in any other documentation provided to user or iii misuse abuse use under abnormal conditions or alteration by anyone other than IDT To the extent permitted by...

Страница 2: ...the Hardware via I 2 C or OWI 5 Figure 2 4 Loading the GUI Configuration File 6 Figure 2 5 Load the NVM Data into GUI 7 Figure 2 6 Writing the Configuration into the ZSSC4151 NVM 7 Figure 2 7 Startin...

Страница 3: ...handling of IC samples 2 Setting up Hardware and Software 2 1 Hardware Setup The Evaluation Kit hardware consists of the following three boards as shown in Figure 2 1 and includes samples of the ZSSC4...

Страница 4: ...e first time that the SSC Communication Board is connected For this reason the PC should be connected to the Internet during the first USB connection so that the operating system can download a driver...

Страница 5: ...ct I 2 C or OWI One Wire Interface from the drop down menu below Protocol see Figure 2 3 2 Click the Connect button On the Evaluation Board verify that the green LED power indicator turns on The ACTIV...

Страница 6: ...load a configuration file Figure 2 4 2 A default configuration file ZSSC4151 cfgx is provided with the software as shown in the File name field in Figure 2 4 If necessary browse to the file location a...

Страница 7: ...provided with the software as shown in the File name field in Figure 2 5 Browse to the file location and click the Open button 3 In the resulting Load RAM Dump window click the Yes button to accept o...

Страница 8: ...utton to begin acquiring and recording measurements see Figure 2 7 2 With the Pressure selected in the Measurements pulldown turn the red knob on the Sensor Replacement Board Figure 2 1 The Pressure G...

Страница 9: ...asurand and temperature 3 1 Setting up the Calibration and Acquiring Data 1 Select the Calibration tab to display the Calibration window see Figure 3 1 2 Ensure that the Calibration Type Settings and...

Страница 10: ...lick the Calculate button The coefficients for the calibration will be calibrated and updated in the calibration formula textbox at the bottom of the window HINT Scroll to the bottom of the textbox so...

Страница 11: ...he GUI settings and NVM contents for this example can be saved to new configuration and NVM dump files Select FILE Save GUI Configuration from the top menu and save the configuration under a new name...

Страница 12: ...to the suitability of IDT s products for any particular purpose an implied warranty of merchantability or non infringement of the intellectual property rights of others This document is presented onl...

Отзывы: