0901133 Rev: A (11/13)
Page 3 of 20
QUICK-START PROGRAMMING
The steps below will give you just the basics to quickly setup a new system — more details and complete
programming information are included in the following pages of this manual.
(1) Press
once (for default 000 access code).
(2) Press ENTER...―ACC‖ will flash briefly on the display. You now have access.
(3) Note that the pump time LED will be flashing.
(4) Press pump SELECT until desired pump number is displayed.
NOTE: If using a flush manifold, program pump ―F‖ on all formulas to set flush time.
(5) Press formula SELECT until desired formula number appears.
(6) Use
/
to input the pump time or flush time (or delay time) in seconds.
(7) Press ENTER…the display will flash indicating that your entry has been saved.
(8) To program a pump delay time, press MODE until delay time LED is flashing. Repeat steps 4 – 7.
(9) To set the load count pump, press ENTER twice (note that pump time & delay time LEDs turn off). Use pump
SELECT to choose the pump number that will be used to count loads for each formula. After a few seconds, the
pump time LED will return, indicating that your entry has been saved.
(10) Press RESET when finished programming and ready to run.
1
4
5
9
2 7
10
3
8
6
Содержание Knight On-Premise Pro
Страница 1: ...0901133 Rev A 11 13 Page 1 of 20 On Premise Pro Instruction Manual...
Страница 16: ...Page 16 of 20 0901133 Rev A 11 13 SYSTEM WIRING DIAGRAM...
Страница 17: ...0901133 Rev A 11 13 Page 17 of 20 SYSTEM PARTS DIAGRAM...
Страница 18: ...Page 18 of 20 0901133 Rev A 11 13 SYSTEM PARTS DIAGRAM...
Страница 19: ...0901133 Rev A 11 13 Page 19 of 20...