background image

 
 
 
i-MARKInstallation and Hardware Manual 
 

Page 14 of 22 

3.2.4

 

Daisy Chain Connectors 

 
To Master 

RJ 45 connector to the Host computer or the Slave port of the previous i-MARK in the 
Daisy Chain. 

To Slave 

RJ 45 connector to the Master port of the next i-MARK in the Daisy Chain. Leave this 
connector open at the last device in the chain. 

 
 

 

View into the connector = crimp/solder side of plug 
 

Pin  To Master 

To Slave 

T568B color 

Description 

RxD+ 

TxD+ 

White/orange 

 

RxD– 

TxD– 

Orange 

 

TxD+ 

RxD+ 

White/Green 

 

V+ (10 … 30V) 

V+ (10 … 30V) 

Blue 

Power supplied over bus 

V+ (10 … 30V) 

V+ (10 … 30V) 

White/Blue 

Power supplied over bus 

TxD– 

RxD– 

Green 

 

GND 

GND 

White/Brown 

Power supplied over bus 

GND 

GND 

Brown 

Power supplied over bus 

 
As the TxD/RxD crossing is done on the i-MARK only straight-through cabling has to be used between 
i-MARKs. 
 
 

Connection parameters 

Signal levels: 

RS422 

Baud rate: 

115200 bits per second 

Data bits: 

Stop bits: 

Parity: 

none 

Mode: 

full duplex 

 

Содержание i-MARK 3

Страница 1: ...tions Inc 360 Herndon Parkway Model Name i Mark 3 Suite 1400 Standards FCC 15 209 IC RSS 210 FCC IC ID O2E ILR IM3 3538B IM3 Herndon VA 20170 http www rheintech com Report 2007198 Page 28 of 34 Append...

Страница 2: ...i MARK 2 i MARK 3 Installation and Hardware Manual...

Страница 3: ...imitation damages resulting from use of or reliance on information presented herein or loss of profits or revenues or costs of replacement goods even if informed in advance of the possibility of such...

Страница 4: ...gainst harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance...

Страница 5: ...ic ribbon and earth yourself permanently for the time you handle the unit Avoid unnecessary contact with the unit connectors and assemblies inside the unit Only open the unit if the operational settin...

Страница 6: ...Chain Connectors 14 4 INITIAL OPERATION 15 4 1 GENERAL 15 4 2 TOOLS REQUIRED 15 4 3 CONFIGURATION 15 4 3 1 Adjusting the Inductive Loop Field 15 4 3 2 Adjusting the Inductive Loop Field 15 4 3 3 Opera...

Страница 7: ...i MARKInstallation and Hardware Manual Page 6 of 22 7 TECHNICAL SPECIFICATIONS 22 7 1 OPERATING DATA 22 7 2 ELECTRICAL DATA 22 7 3 MECHANICAL DATA 22 7 4 ENVIRONMENTAL CONDITIONS 22...

Страница 8: ...open the housing in order to set any ILR unit No unit has any internal setting elements or displays All settings are performed using software via the Service Interface Earthing Before establishing any...

Страница 9: ...e Observe all normal precautions for the use of tools Use ESD protected packaging material Never use measuring units with low impedance for measuring or testing systems with semi conductor components...

Страница 10: ...cable antenna and data tag holder etc are available 2 2 Scope of This Document This document is the hardware description of both the i MARK 2 and i MARK 3 This document is intended only for mechanical...

Страница 11: ...erman order code Reg No IM 0731 EN English order code Hardware description and installation manual this document Reg No IM 0732 DE German order code Reg No IM 0732 EN English order code Firmware descr...

Страница 12: ...i MARK Installation and Hardware Manual Page 11 of 22 3 Installation 3 1 Mechanical Installation 3 1 1 i MARK 2...

Страница 13: ...i MARKInstallation and Hardware Manual Page 12 of 22 3 1 2 i MARK 3...

Страница 14: ...ot Ethernet compatible Industry standard Cat 5 straight patch cables can be used to daisy chain the devices Glossary SELV Safety Extra Low Voltage Protective measure against dangerous body currents Pr...

Страница 15: ...r side of plug Pin To Master To Slave T568B color Description 1 RxD TxD White orange 2 RxD TxD Orange 3 TxD RxD White Green 4 V 10 30V V 10 30V Blue Power supplied over bus 5 V 10 30V V 10 30V White B...

Страница 16: ...uetooth interface Software PDA Service Tool i MARK Controller PC Service Tool i MARK Config 4 3 Configuration In a standard installation only this settings need configuring Adjust the inductive loop f...

Страница 17: ...must be the first device in the bus hierarchy When configured as a master it is only able to communicate with devices which are connected off of its slave port As such all other i MARKs connected mus...

Страница 18: ...8 9 10 11 12 Marker 1 T T T T T T Marker 2 T T T T T T Configuration example with 4 i MARKs none of them can transmit at the same time Slot number 1 2 3 4 5 6 7 8 9 10 11 12 Marker 1 T T T Marker 2 T...

Страница 19: ...lly checked The installation check can be divided into three sections Visual test Basic operational check Detailed operational check If the basic check of the operational behavior is to be carried out...

Страница 20: ...epends on the relevant system concept and very likely varies from one system to another 5 2 Status Display LEDs LOOP This LED lights green during sending a LF telegram about 20 ms In the case of a loo...

Страница 21: ...ed on the data sheets of the tag 6 3 Precautionary Maintenance Regular checking of all ports and cables belonging to the system is recommended Unstable connections could lead to damage and malfunction...

Страница 22: ...In order to keep the down times short it is recommended to set these parameters before the component is entered into the spare part stock system In most cases all units within an identification system...

Страница 23: ...er of readers per daisy chain 16 Maximum cable runs between two i MARKS 300 m Maximum overall cable runs of daisy chain 1000 m only with GND free power supplies at every i MARK 7 2 Electrical Data Hos...

Отзывы: