21
TP12KC-DX
Jun 2017
C. The latches should click close together as the lift is being raised. If not, adjust cables for proper
equalization and tightness.
D. The first time a vehicle is placed on the lift, raise it no higher than three feet. Lower the vehicle onto
the safety latches. Raise the lift a few inches and pull latch release lever then lower the vehicle to
the floor.
E. Raise the vehicle to full height and lower the carriages onto the safety latches. Lower the vehicle to
the floor.
F. After cycling the lift ten times with a vehicle on it, recheck the tightness of the anchors to at least
110 ft-lbs.
The Lift is now ready for Operation.
Содержание TP12KC-DX
Страница 9: ...9 TP12KC DX Jun 2017 Figs 1 2 Elevation Floor Layout ...
Страница 28: ...28 TP12KC DX Jun 2017 5 Exploded View Parts List ...
Страница 33: ...33 TP12KC DX Jun 2017 7 Warranty Policy ...