9
Nov. 2021
MSC-13K
4.
Fix the reel on the base by the screw. (Fig 4-1d)
Fig. 4-1d Fig. 4-1e
5.
Put the cable plug into the socket. (Fig 4-1e)
6.
Repeat the above steps for the other three columns
3. CHARGING BATTERIES
After one day’s operation or the battery indicator [22] shows the voltage is low, it is
suggested to charge the batteries. Different batteries need different charging time.
Please refer to the manual of the battery.
a) Move the columns near the AC power supply ports on the wall.
b) Connect the charger to the AC power supply. (Fig. 10)
c) Turn the power switch to the right position (CHARGE) on each column.
d) While charging, the red CHARGING indicator will be lighted. After the batteries
are fully charged (about 10 hours), the green FINISH indicator will be on and red
indicator will go off.
Battery Charger Socket Switch Charger Indicator
Fig. 10
Содержание MSC-13K-B
Страница 4: ...4 Nov 2021 MSC 13K 1 2 DIMENSIONS mm inch Fig 1 Mobile Column Lift Dimensions...
Страница 34: ...34 Nov 2021 MSC 13K MSC 13K B EXPLODED VIEWS PARTS LISTS MSC 13K Column Assembly...
Страница 35: ...35 Nov 2021 MSC 13K...
Страница 36: ...36 Nov 2021 MSC 13K...
Страница 37: ...37 Nov 2021 MSC 13K...
Страница 41: ...41 Nov 2021 MSC 13K MSC 13K Control Panel Assembly...
Страница 44: ...44 Nov 2021 MSC 13K MSC 13K Power Unit Assembly...