
GENERAL
Mini
Installation & Servicing
3
Mini
Mini C24
G.C. appliance No. 47---348---18
Mini C28
G.C. appliance No. 47---348---19
Mini C32
G.C. appliance No. 47---348---25A
Mini S24
G.C. appliance No. 41---392---98
Mini S28
G.C. appliance No. 41---392---99
PI No.
0694BM3420
Destination countries: GB, IE
CONTENTS
Air supply
7
Boiler clearances
4
Boiler exploded view
11
Electrical connections
17
Electrical supply
8
Fault finding
47
Flow wiring diagram
22
Flue fitting
13
Gas conversion
27
Gas safety regulations
5
Gas supply
6
Installation
12
Mandatory requirements
5
Replacement of components
32
Servicing
28
Short list of parts
54
Thermostatic radiator valves
9
Water connections
16
Water treatment
7
Wiring diagrams
18
For GB, to comply with Building Regulations Part L1 (Part J in Scotland) the boiler should be fitted in accordance with the
manufacturer’s instructions. Self---certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark log book.
Benchmark Log Book Details
Boiler
Page
Make and model
3
Appliance serial no. on data badge
11
SEDBUK No. %
2
Controls
Time and temperature control to heating
23/24
Time and temperature control to hot water
24
Heating zone valves
23
TRV’s
9
Auto bypass
9
Boiler interlock
9
For all boilers
Flushing to BS.7593
7
Inhibitor
7
Central heating mode
Heat input
to be calculated
Boiler
Page
Burner operating pressure
measure and record
Central heating flow temp.
measure and record
Central heating return temp.
measure and record
For combination boilers only
Scale reducer
9
Hot water mode
Heat input
to be calculated
Max. operating burner pressure
measure and record
Max. operating water pressure
measure and record
Cold water inlet temp
measure and record
Hot water outlet temp.
measure and record
Water flow rate at max. setting
measure and record
For condensing boilers only
Condensate drain
n/a
For all boilers:
complete, sign & hand over to customer
For assistance see Technical Helpline on the back page
NOTE TO THE INSTALLER: leave these
instructions adjacent to the gas meter.
Also complete the benchmark log book and give
this to the customer