Installation

GENERAL

FLUE INSTALLATION

Some pluming may occur at the termination so terminal
positions where this could cause a nuisance should be
avoided.
The flue must be installed in accordance with the
recommendations of BS. 5440-1:2000.   In IE refer to I.S. 813:2002.
The following notes are intended for general guidance:-
1. The boiler MUST be installed so that the terminal is

exposed to external air.

2. It is important that the position of the terminal allows the

free passage of air across it at all times.

3. Minimum acceptable spacing from the terminal to

obstructions and ventilation openings are specified in Table 3.

4. Where the lowest part of the terminal is fitted less than 2m

(6'6") above a balcony, above ground or above a flat roof to
which people have access then the terminal MUST be
protected by a purpose designed guard.  The minimum
spacing in Table 3, Nos. 2,3, 4, 5 and 6 would be 75mm in
order to allow a terminal guard to be fitted.

Terminals guards are available from boiler suppliers - ask for
TFC Flue Guard Model K1.  In case of difficulty seek advice
from:

Grasslin (UK) Ltd., Tower House, Vale Rise, Tonbridge,
Kent TN9 1TB.
Tel: +44 (0) 1732 359 888.  Fax: +44 (0) 1732 354 445
www.tfc-group.co.uk

Ensure that the guard is fitted centrally.

5. The air inlet/products outlet duct and the terminal of the boiler

MUST NOT be closer than 25mm (1") to combustible material.
Detailed recommendations on the protection of combustible
material are given in BS.5440-1:2000.  

In IE refer to

I.S.813:2002.

6. Where it is essential that the terminal wall plate is fitted, i.e.

wall thicknesses over 600mm (23 1/2") or with an inaccurately
cut hole, the minimum spacing in Table 3 Nos. 2,3, 4, 5 and 6
would be 60mm (2 

1/2

") in order to allow the terminal wall

plate to be fitted.

7. The flue assembly shall be so placed or shielded as to

prevent ignition or damage to any part of any building.

IMPORTANT. It is absolutely ESSENTIAL to ensure, in practice,
that products of combustion discharging from the terminal cannot
re-enter the building or any other adjacent building through
ventilators, windows, doors, other sources of natural air infiltration
or forced ventilation/air conditioning. If this should occur, the
appliance MUST  be turned OFF, labelled 'unsafe' and corrective
action taken.

TERMINAL

The terminal assembly can be adapted to accommodate various
wall thicknesses.  Refer to Frames 7 and 27.

AIR SUPPLY

Detailed recommendations for air supply are given in
BS.5440:2. 

In IE refer to I.S. 813:2002.

The following notes are for general guidance:

1. It is NOT necessary to have a purpose provided air vent in

the room or internal space in which the boiler is installed.

2. If the boiler is to be installed in a cupboard or compartment,

permanent air vents are required (for cooling purposes) in
the cupboard/compartment, at both high and low levels. The
air vents must either communicate with room/internal
space, or be direct to outside air. The minimum effective
areas of the permanent air vents, required in the cupboard/
compartment, are specified as follows and are related to
maximum rated heat input.

3. Both air vents MUST communicate with the same room or

internal space or MUST be on the same wall to outside air.

4. In siting the air vents care must be taken to avoid the

freezing of pipework.

Table 4 - High and low vent areas

Boiler

Air from room/internal

Air direct from

space cm

2

 (in.

2

)

outside cm

2

 (in.

2

)

High level

Low level

High level

Low level

440 FF

143 (23)

143 (23)

72 (12)

72 (12)

450 FF

173 (27)

173 (27)

87 (14)

87 (14)

460 FF

208 (33)

208 (33)

104 (17)

104 (17)

470 FF

245 (38)

245 (38)

123 (19)

123 (19)

480 FF

282 (44)

282 (44)

141 (22)

141 (22)

WATER CIRCULATION SYSTEM

The boiler must NOT be used for direct hot water supply. The
boiler is suitable for connection to pumped open vent central
heating systems, pumped central heating combined with pumped
or gravity indirect domestic hot water supply systems.

The boiler is NOT suitable for gravity heating systems.  The
hydraulic resistances of the boilers at 

maximum output with 11ºC

(20ºF) temperature differentials are shown in the graph below.

The central heating system should be in accordance with
BS. 6798 and, in addition, for  smallbore and microbore systems,
BS. 5449:1.

The domestic hot water system, if applicable, should be in
accordance with the relevant recommendations of BS. 5546.

Table 3 - Balanced flue terminal position

 Approved Manufacturer’s Clearances

Terminal Position

Minimum Spacing

1a. Directly BELOW an opening, air brick,

opening window, etc.

300 mm (12")

1b. Directly ABOVE an opening, air brick,

opening window, etc.

300 mm (12")

1c. HORIZONTALLY to an opening,

air brick,opening window, etc.

300 mm (12")

2.

Below guttering, drain pipes or soil
pipes

25 mm

( 1")

3.

Below eaves

25 mm

( 1")

4.

Below balconies or a car port roof

25  mm

( 1")

5.

From vertical drain pipes or soil pipes

25 mm

( 1")

6.

From an internal or external corner or
to a boundary alongside the terminal

25 mm

( 1")

7.

Above adjacent ground, roof or
balcony level

300 mm (12")

8.

From a surface or a boundary
facing the terminal

600 mm (24")

9.

From a terminal facing a terminal

1200  mm (48")

10. From an opening in a car port

(e.g. door or window) into dwelling

1200 mm (48")

11. Vertically from a terminal on the

 same wall

1500 mm (60")

12. Horizontally from a terminal on the wall

300 mm (12")

Содержание Mexico Super 450 FF

Страница 1: ...1 Mexico Super 440 FF 480 FF Installation...

Страница 2: ...0 000 14 7 50 000 17 6 60 000 20 5 70 000 23 4 80 000 Burner Setting Pressure hot mbar in w g 10 3 4 4 11 8 4 7 12 2 4 9 10 6 4 3 13 2 5 3 Seasonal Efficiency SEDBUK Band D 78 2 78 9 79 0 80 5 79 8 Bo...

Страница 3: ...OG BOOK DETAILS Boiler Page Make and model 3 Appliance serial no on data badge 8 SEDBUK No 2 Controls Time and temperature control to heating 25 Time and temperature control to hot water 25 Heating zo...

Страница 4: ...current ETCI rules for electrical installation Detailed recommendations are contained in the following British Standard Codes of Practice BS 6891 Low pressure installation pipes BS 6798 Installation o...

Страница 5: ...l space will be required for installation depending upon site conditions IMPORTANT In order to facilitate gas connection a clearance of at least 100 mm 4 must be available at either the left hand side...

Страница 6: ...es are for general guidance 1 It is NOT necessary to have a purpose provided air vent in the room or internal space in which the boiler is installed 2 If the boiler is to be installed in a cupboard or...

Страница 7: ...y softened water is NOT permitted 4 Under no circumstances should the boiler be fired before the system has been thoroughly flushed BOILER CONTROL INTERLOCKS Caradon Ideal Limited recommend that heati...

Страница 8: ...Thermostat pocket 7 Distributor tube 8 Combustion chamber 12 Collector hood 14 Fan assembly 16 Front plate assy 42 38 12 14 49 41 5 1 7 Tie rod 8 46 Mex 1878 Data badge 28 16 18 30 6 69 68 2 4 3 24 IN...

Страница 9: ...ectrical connector between the control box and the PCB box 4 Remove the thermostat phial from the pocket as shown in Frame 6 5 Remove the 2 screws securing the control panel and pull down to release t...

Страница 10: ...Flue extensions of greater than 1m 39 should be supported with the bracket provided It is MOST IMPORTANT that the boiler is installed in a vertical position 7 DETERMINING THE FLUE LENGTH 6 BOILER CAS...

Страница 11: ...tat Position Back Section Front Section CH DHW Flow Return Flow Return Top LH LH RH RH LH LH RH RH LH LH RH RH LH LH RH RH LH LH RH RH Table 6 Gravity Domestic Hot Water and Pumped Central Heating Tab...

Страница 12: ...inst the wall stick the self adhesive foam strip provided in the hardware pack onto the flue immediately behind the boiler sealing ring otherwise refer to Frame 13 1 Tape the template into the selecte...

Страница 13: ...location of the studs into the boiler back panel 3 Proceed to Frame 15 item B B Outside fitting Proceed to Frame 15 item A 1 Secure the flue to the boiler using the three M5 wing nuts provided Note T...

Страница 14: ...t and the rubber weather seal trimmed around the groove provided The terminal wall plate need not be fitted 17 SIDE FLUE ASSEMBLY Exploded view For wall thickness 114mm to 600mm 1 The boiler turret as...

Страница 15: ...the notch aligns with the groove on the outer flue duct This ensures correct alignment of the flue terminal 2 Drill 3 holes 3 2mm 1 8 dia through the outer flue duct and boiler sealing ring Do not dr...

Страница 16: ...G THE BOILER A If the flue assembly can be fitted from the outside proceed as follows 1 Move the boiler into position ensuring that the flue outlet is in line with the wall opening 2 Insert the flue a...

Страница 17: ...ide of the boiler casing greater than 600mm 23 1 2 Refer to Frame 7 7 When cutting the ducts always use the cardboard support provided 27 PREPARING THE WALL 1 Mark onto the wall the position of the fl...

Страница 18: ...te length A of outer flue duct refer to Frame 7 Ensure the boiler sealing ring is fully engaged 2 Drill 3 holes 3 2mm 1 8 dia through the outer flue duct and boiler sealing ring Do not drill the inner...

Страница 19: ...25mm to the side wall the side outlet plate must be fitted now 1 Split the side outlet plate into 2 down the split line 2 Fit the 2 halves of the side outlet plate to the wall ensuring they are behind...

Страница 20: ...Elbow 1m 45 o Elbow 0 7m 37 FITTING THE KIT 1 Remove the cardboard support aid from the flue and place safely to one side 2 Fit the inner flue extension duct onto the inner flue duct 3 Fit the outer f...

Страница 21: ...sure of 20 mbar 8 in w g MUST be available at the boiler inlet with the boiler operating 2 Extend a gas supply pipe NOT LESS THAN 15mm 1 2 OD to the boiler and connect to the gas cock situated at the...

Страница 22: ...ween the top of the boiler and the base of the cylinder 41 MINIMUM REQUIREMENTS Fully pumped systems 1 Open vent and cold feed connections must be made to the boiler flow and return tappings according...

Страница 23: ...ctrical leads into the box and wire into the terminal strip as shown Notes a Secure each lead with one of the cable clamps b The mains lead connection MUST be made so that should the lead slip from it...

Страница 24: ...24 Mexico Super 440 FF 480 FF Installation INSTALLATION 46 PICTORIAL WIRING LEGEND w white r red bk black br brown p purple b blue gy grey y g yellow green INSTALLATION...

Страница 25: ...on thermostats is specific to the manufacturer 3 This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Autozone has grey and orange auxiliary switch leads but the GREY...

Страница 26: ...outside the house or if the boiler will be left off for more than a day or so then a frost stat should be wired into the system This is usually done at the programmer in which case the programme selec...

Страница 27: ...If adjustment is necessary remove the sealing cap and turn the adjusting screw clockwise to increase anticlockwise to decrease the pressure until the required burner pressure is achieved Refit the sea...

Страница 28: ...ould be fully explained to the householder to ensure the greatest possible fuel economy consistent with household requirements of both heating and hot water consumption Advise the User of the precauti...

Страница 29: ...to step d d Clean the main burner e Clean the heat exchanger f Clean the main injectors g Check that the flue terminal is unobstructed and that the flue system is sealed correctly h If the appliance...

Страница 30: ...Only 1 Remove the 2 screws and lift off the lower front panel Refer to Frame 57 2 Remove the grille assembly Undo the gas cock union 3 Disconnect the ignition lead from the PCB 4 Remove the 4 wing nu...

Страница 31: ...front plate 2 Fit the new sightglass and re assemble as shown 3 Retighten the 2 M5 hexagon nuts to ensure an airtight seal Do NOT overtighten 61 RE ASSEMBLY 62 GAS PRESSURE ADJUSTMENT 1 Pilot Pressure...

Страница 32: ...RMOSTAT REPLACEMENT 1 Remove the 2 screws and lift off the lower front panel then remove the grille assembly Refer to Frames 57 Undo the gas cock union Remove the 4 wing nuts and withdraw the burner a...

Страница 33: ...lease from its clamp 9 Assemble new control box and panel and fit to the casing in reverse order 10 Insert control thermostat phial into pocket and secure with the split pin 11 Refit the inline electr...

Страница 34: ...B 3 Prise the retaining clip out of the groove in the electrode using a small screwdriver and withdraw the electrode 1 Remove the 2 screws and lift off the lower front panel then remove the grille ass...

Страница 35: ...ing compound and re assemble in reverse order 1 Remove the 2 screws and lift off the lower front panel then remove the grille assembly refer to Frame 57 Undo the gas cock union Remove the 4 wing nuts...

Страница 36: ...the barbs on the PCB stand offs to release the PCB from the box 6 Fit the new PCB and reassemble in reverse order 7 Refit the boiler casing 8 Check the operation of the boiler 1 Remove the lower fron...

Страница 37: ...switch greater than 0 9 mbar Change fan YES NO Change pressure switch Does the pilot light NO YES NO YES Does the spark stop after pilot is lit NO Is there a gas supply to the boiler Is the pilot inj...

Страница 38: ...nition electrode HONEYWELL 45900413 004 1 151 079 27 HT lead 900 mm 440 450 460 470 480 FF 1 058826 30 PCB sub assembly 1 170 665 38 Pressure switch HONEYWELL C6065F1316B 1 155 412 49 Flue baffle kit...

Страница 39: ...39 Mexico Super 440 FF 480 FF Installation SHORT LIST OF PARTS 76 SHORT PARTS Mex 1879...

Страница 40: ...80 FF Installation LIST OF PARTS Legend 63 Control panel complete assy 65 Control box assy 66 Control thermostat 77 BOILER CONTROL PANEL Exploded View 67 Control thermostat knob 71 Control front panel...

Страница 41: ...41 Mexico Super 440 FF 480 FF Installation LIST OF PARTS 78 PCB BOX Exploded View Legend 29 PCB Chassis assembly 30 PCB sub assembly 34 PCB support 37 PCB cover...

Страница 42: ...D CONTROLS ASSEMBLY Exploded View Legend 16 Front plate assy 17 Sightglass assy 18 Burner manifold 19 Pilot pipe 20 Main burner 21 Main injector 22 Pilot burner 24 Gas valve 25 O ring 26 Ignition elec...

Страница 43: ...Installation LIST OF PARTS Legend 46 Baseplate 62 Casing complete 63 Controls panel complete 71 Controls front panel door 73 Side panel LH 74 Side panel RH 75 Lower front panel 76 Top panel 77 Grille...

Страница 44: ...rs a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498 432 THIS SYMBOL IS YO...

Отзывы: