IDEAL 60-1500 Wheel Aligner Manual
II.
Getting Started
2.1 Equipment Transport Conditions
The aligner must be shipped in its original packing and stowed in the position
indicated on the outside.
To avoid damage, never place other items on top of the packaging.
Handling of the crated aligner must be performed only with an appropriate
lifting device such as a forklift or pallet jack.
Only personnel who are experienced and qualified in freight handling
procedures should handle any transportation or moving of the crated aligner.
Inspect for any damage to the crate and notify your local distributor (and/or
freight company) immediately if any damage is observed.
Uncrating Instructions
:
Carefully remove packing materials. Be careful when cutting banding material
as items may loosen and fall, causing personal harm or injury.
Always wear gloves when uncrating to prevent scratches, abrasions, or cuts
due to the contact with packing materials.
Retain all packaging in case you need to return any parts for warranty or
servicing. Carefully unpack and inventory all items. Familiarize yourself with
all components before beginning set up and assembly.
5