IDEAL imax plus F120 Скачать руководство пользователя страница 15

15

 

Installation & Servicing

INSTALLATION

15 MAINS ELECTRICAL CONNECTIONS

1. The appliance MUST be wired with a permanent live supply.  Use the plug 'A'

provided for this purpose.  The mains supply must meet with the regulations in
Frame 14.  The boiler is phase sensitive so correct connection of the live and
neutral wires is essential.  The supply must not be interrupted by any system
controls.  Controlling the mains input in this way will prevent the pump over-run
sequence and may cause damage to the heat exchanger.

2. A system pump must be connected to the boiler via a relay to ensure pump over-

run.  A 230V AC output is provided for this purpose on terminals 11, 12 & 13.

16 CH CONTROLS CONNECTIONS

Note.

For some of the optional control methods it will be necessary
to access the parameter mode.  This is done by entering the
Service Code described in  Frame 26 and must only be
performed by trained installers and Service Engineers.

1. Timer/Thermostat with Optional Weather Compensation

The boiler can be operated with a timer and/or room
thermostat.  Terminals (5 & 6) with a 24V supply and return
are available to be switched, open/closed circuit, by a timer
and/or room thermostat.  The boiler senses open circuit as
no call for heat and closed circuit as call for heat.  Mains
voltage MUST NOT be applied to these terminals.  Optional
fitting of the outside sensor (provided with the boiler) to
terminals 3 & 4 is automatically detected.  The flow
temperature is then compensated against outside
temperature in CH mode.  See frame 34

 

for details on the

specific behaviour of the boiler with this control and how to
modify the heating curve.

2. Outside Sensor with Night Time Set Back

The boiler can be operated with a permanent call for heat,
with the flow temperature compensated against outside
temperature in CH mode.  It is necessary to change
parameter A 1st digit to '1x' see Frame 29.  The outside
sensor (provided with the boiler) should be connected to
terminals 3 & 4.  To control the night time setback period
(period of lower room temperature) a timer should be
connected across terminals 5 & 6.  These terminals
provide a 24V supply and return to be switched open/
closed circuit.  Open circuit enables the night time set back
period.  If no night time set back period is required then a
link wire should be placed across terminals 5 & 6.  Mains
voltage MUST NOT be applied to these terminals.  See
Frame 35

 

for details on the specific behaviour of the boiler

with this control and how to modify the heating curve.

3. BMS Control

The boiler can be operated using a BMS control.  It is
necessary to change parameter A 1st digit to '2x' see
Frame 29.  A BMS can be used to operate the boiler using
a 0-10V signal to control the set flow temperature.  The
positive signal from the BMS should be connected to
terminal 9 and the ground signal to terminal 10.  An alarm
signal in the event of a lockout is available to the BMS from
terminals 14 & 15.  In the event of a lockout the boiler
closes the circuit between these terminals.  A link wire
should be connected between terminals 5 & 6.  Open
circuit would enable the parallel shift controlled by
parameter 7.  See Frame 35

 

for details on the specific

behaviour of the boiler with this control, and how to modify
the relationship between signal voltage and set flow
temperature.

Note.

Fitting the Outside Sensor

A. The sensor should be located on an external wall of the

building to be heated.  Fix the sensor to a north/north-east
facing wall to avoid direct radiation from the sun.  The
sensor should be located to avoid any heating effect from
the boiler flue.

B. To fix the sensor to the wall, unscrew the sensor box plastic

cover and screw/plug the sensor body to the wall.  Wire a
twin core 0.5mm

2

 cable to the sensor via cable gland

provided.  Avoid running this cable alongside mains
voltage cables.

C. Connect the emc filter provided with the sensor to terminals

3 and 4 in the boiler.  Connect the cable from the sensor to
the emc filter.  The connections can be made irrespective
of polarity.

A

ELECTRICAL CONNECTION OF SYSTEM PUMP

n a

n c

c

11

1 2 1 3

L

N

L ine

N e u tra l

3-contact relay

n a

n c

c

11

1 2 1 3

 

L

N

L ine

N e u tra l

System pump

3-contact relay

System pump

NO CALL
FOR HEAT

CALL
FOR HEAT

ima7214

Note.

All 230V wiring and 24V wiring MUST be kept
separate.  For this reason separate conduits are
provided for bringing wiring into the boiler.

INST

ALLA

TION

Содержание imax plus F120

Страница 1: ...D When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require Do not use reconditioned or copy parts that...

Страница 2: ...3 910 Btu ft3 nett at 15 C and 1013 25 mbar a For l s divide the gross heat input kW by the gross C V of the gas MJ m3 b For ft h3 divide the gross heat input Btu h by the gross C V of the gas Btu ft3...

Страница 3: ...g systems Fully pumped systems may be open vented or sealed The range of boilers is NOT suitable for 1 Gravity DHW systems 2 Gravity heating systems 3 Direct domestic hot water supply 4 Single feed in...

Страница 4: ...r conditioning If this should occur the appliance MUST be isolated from the gas supply labelled as unsafe until corrective action can be taken Terminal Position Due to the high efficiency of the boile...

Страница 5: ...rrent suitability should be confirmed directly with the manufacturer G E Betz Ltd Sentinal Division Foundry Lane Widnes Cheshire WA8 8UD Tel 0151 424 5351 or Fernox Manufacturing Co Ltd Cookson Electr...

Страница 6: ...GRAPH 1 WATER PRESSURE LOSS ima 5774 F80 F120 F160 20 C F 80 20 C F 120 11 C F160 11 C F 120 11 C F 80 20 C F 160 1300 1250 1200 1150 1100 1050 1000 950 900 850 800 750 700 650 600 550 500 450 400 350...

Страница 7: ...y are on the R H or on the L H side of the boiler see views on the left Flue connection shown on RH side options shown dotted at rear or left Model Modules No off A B Weight Connections ima 5773 The b...

Страница 8: ...ING CIRCUIT PRIMARY BOILER CIRCUIT ima 5790 The use of a mixing header means that compensating controls can be used to operate mixing valves on a variable temperature circuit without affecting the wat...

Страница 9: ...t 4 The boiler is at the highest point of circulation in the system Systems designed to rise above the boiler flow tappings will automatically require a minimum static head higher than that shown 5 Th...

Страница 10: ...alarms may be necessary Expansion vessels used must comply with BS 4814 and must be sized on the basis of the total system volume and initial charge pressure Initial minimum charge pressure should not...

Страница 11: ...TC Temperature Sensors 3 to 8 Overheat Thermostats 3 to 8 Burners 2 to 7 Aluminium Heat Exchanger 3 to 8 Sections Condensate Sump Flue Collector Box Boiler Frame Filling Up Elbow Min Depth 100 mm ima...

Страница 12: ...connections simply remove the blanking plates from the connection required and attach the flue air connections Seal off the unused connections with the removed blanking plates Note To enable cleaning...

Страница 13: ...IN A condensate drain for the boiler should be assembled as shown below This can be built using the parts provided plus other pieces not supplied The parts provided are 40mm plastic pipe All additiona...

Страница 14: ...rb the lip seal The flue should be supported in such a way as to not place a load on the flue manifold 14 ELECTRICAL CONNECTIONS Warning This appliance MUST be earthed A mains supply of 230V 50Hz is r...

Страница 15: ...hese terminals provide a 24V supply and return to be switched open closed circuit Open circuit enables the night time set back period If no night time set back period is required then a link wire shou...

Страница 16: ...e of providing the boiler with the actual stored DHW temperature allowing closer output matching and reduced cycling Use of a tank sensor kit cannot be timer controlled A diverting valve or a separate...

Страница 17: ...BROWN BLUE YEL GRE RED YEL GRE ORANGE RED BLUE BLUE GREEN GREEN WHITE RED BLUE BLACK BLUE BLACK BLUE BROWN FILTER GE FITELEC 1 YEL GREEN YEL GREEN YEL GREEN YEL GREEN CVI CONTROL MAIN SUPPLY 230 V 50...

Страница 18: ...ate required and the flow temperature required It can communicate directly with the CVI controls of 2 modules The AM 5 board is a supplementary board used with boilers containing more than 2 modules I...

Страница 19: ...F O N 1 2 O F F O N The Modular Boiler Drive MBD see Frame 20 for location manages to check a two burner group 2 x 40 80 kW For boilers with outputs greater than 80 kW 1 2 or 3 supplementary AM 5 boa...

Страница 20: ...rough a relay powers the 3 way valve thus closing port A and opening port B Simultaneously terminal 16 is energised which through another relay powers the primary system pump If PARA A 2nd digit is se...

Страница 21: ...Installed on the Secondary Circuit in Parallel with the Heating Circuit 1 2 4 3 5 76 ST O R E M O D E R ES ET ST EP 16 1718 11 12 13 ima 5783 Flow Return Filter Primary System Pump Mixing header non r...

Страница 22: ...n installer once he has entered the service code By pressing the mode key again DATA mode is displayed In this mode it is possible to read information on the operation of the boiler The following mode...

Страница 23: ...O R E M O D E R E S E T As above As above it selects parameters data all single test all single it chooses the mode It displays when in DATA mode It stores when in PARA mode it in creases or decreases...

Страница 24: ...sing mode S T E P S T O R E M O D E R E S E T it selects parameters data all single test all single it chooses the mod e It displays when in DATA mode It stores when in PARA mode it in creases or decr...

Страница 25: ...y 11 1 6 0 Maximum CH Flow Temperature Setpoint degC S T E P 30 90 80 3 8 0 Flow Temperature Minimum Design Setpoint degC Press Display Description Parameters accessible to trained installers and serv...

Страница 26: ...P E 2 0 Ignition fan speed of parameter C S T E P F 2 0 2nd Digit DHW type x0 3 way valve normally open to CH system x1 DHW pump x2 3 way valve normally open to DHW tank DO NOT ADJUST 58 DO NOT ADJUST...

Страница 27: ...ow temperature NTC1 C Local return temperature NTC2 C Module 4 fan speed set point rpm Module 4 actual fan speed rpm Local flow temperature NTC1 C Local return temperature NTC2 C Module 5 fan speed se...

Страница 28: ...emperature NTC2 C Module 6 fan speed set point rrpm xxxx Module 6 actual fan speed rpm xxxx Local flow temperature NTC1 C Local return temperature NTC2 C Module 7 fan speed set point rrpm xxxx Module...

Страница 29: ...burner module 3 Test mode low for burner module 3 Test mode off for burner module 4 Test mode high for burner module 4 Test mode low for burner module 4 S T E P A L L S T E P B U R 1 S T E P B U R 2 S...

Страница 30: ...nd closing the circuit connected across terminals 5 6 Without the outside sensor connected PARA 3 fixes the boiler set flow temperature If the outside sensor is connected automatic detection then the...

Страница 31: ...ws the building temperature to be dropped during periods e g night time The heating curve can be adjusted using the following parameters see also Frames 26 and 28 Parameter 3 Highest set flow temperat...

Страница 32: ...ON 4 Fill the condensate trap with water before putting the unit into operation see frame 11 for guidance 5 Check the indication on the pressure gauge sealed system installations If the pressure is l...

Страница 33: ...in a safe place for ready reference IMPORTANT Point out to the owner that the boiler must have regular maintenance and cleaning at least annually in order to ensure reliable and efficient operation Re...

Страница 34: ...it is checked at regular intervals and serviced as necessary The frequency of servicing will depend upon the installation condition and usage but should be carried out at least annually Caradon Ideal...

Страница 35: ...ssed air through the metal fibre side of the burner Do not brush the metal fibre side of the burner If they show any signs of damage they must be replaced 12 Inspect the heat exchanger some aluminium...

Страница 36: ...f the silicon tubes to the air pressure switch Measure the signal across the air pressure switch If greater than 53 Pa replace the air pressure switch If less than 53 Pa check the following Check for...

Страница 37: ...es are equivalent the code with the lowest first digit prevails in the case that the first digits are equivalent the code with the highest second digit prevails Error Code Description Alarm L1 2 Local...

Страница 38: ...ons The NTC and or wiring of the global temperature involved is defective Insufficient or even no circulation of water due to the obstruction of the sections or pump failure ERRORCODESRELATEDTOGLOBALT...

Страница 39: ...ir Vent 1 173 029 32 Global Flow Return Sensor T7335D1040 12K 2 173 038 32 Module Temperature Sensor 1 per Section T7335D1040 12K 5 to 8 173 038 1 Module Temperature O H Sensor 1 per Section T7335D104...

Страница 40: ...ent in the design and performance of its products The right is therefore reserved to vary specification without notice The Ideal Boilers Technical Training Centre offers a series of first class traini...