HYDRAULIC TILT-A-WAY
OPERTOR FIELD INSTALLATION
DRAWING RGHY-3002
HYJD-25,HYJD-25E, SSHYJD-25 & SSHYJD-25E
REF. NO. DESCRIPTION
Note: If gate does not operate on first try, but hydraulic pump runs
switch 2 power lines to reverse pump rotation
.
1 Control pedestal
HYJD-25 & SSHYJD-25
Concrete support slab. Minimum dimensions 11’0” long x 4’0” wide x 1’ 6” thick.
1 Control pedestal
HYJD-25E & SSHYJD-25E
Concrete support slab Minimum dimensions 12’0” long x 4’0” wide x 1’6” thick.
To be placed on firm soil or compacted fill, reinforced with #4 rebar each way; and cement piling dug to frost
line by purchaser
NOTE: Will withstand and estimated 100 MPH wind in most soil conditions.
2 Electrical conduit area. Stub in electrical supply, 20 Amp service.
3 Four anchor bolts ¾” diameter with 2” projection. Set in slab or expansion type.
4 Two base plates, furnished loose with pedestal. Level with grout and bolt in place.
5 Four corner field welds. Place pedestal on base plates with exact alignment and weld.
TILT-A-WAY
HYDRAULIC OPERATOR INSTALLATION PROCEDURE FOR GATE THAT IS SHIPPED
UNASSEMBLED DRAWING RGHY-3002
1. Remove all materials used for protection during shipment.
2. Find two base plates, place them over the anchor bolts of prepared foundation. Fasten base plates
to concrete pad.
3. Place pedestal on to secured base plates. Align and level pedestal, tack weld in place to insure pedestal does not
move when performing steps 4 through 9. Remove lifting hook.
4. Open rear access door to expose spring tension adjustment screws.
5. Find two fluid bypass valves, place in open position.
6. Back off spring tension screws to provide slack in tension cables. (1 5/8” socket needed)
7. Rotate barrier carriage to down position. Remove pivot shaft with attached components. Install barrier and
secure to vertical carriage post with three bolts and bolt at outer end of carriage horizontal channel.
8. Place plastic rub washer over pivot shaft collar on carriage. Align cylinder rod end bearing with collar and
insert pivot shaft from far side. Secure with flat washer, lock washer and bolt.
9. Tighten spring tension screws while inspecting cables for proper wrap around balance sheaves. When slide
members have reached marks indicated on tracks. Proper balance tension will have been achieved. If at a later
date minor adjustment should be required, refer to balance system adjusting section.
10. Align gate for permanent position and secure pedestal to base plates with field welds at each corner.
11. Perform required electrical connections in accordance with diagrams shown in this manual.
12. Position fluid bypass valves to closed setting, close and secure access door.
13. If gate fails to function properly, contact manufacturer’s representative.
TILT-A-WAY
HYDRAULIC OPERATOR INSTALLATION PROCEDURE FOR GATE THAT IS SHIPPED
ASSEMBLED DRAWING RGHY-3002
1. Remove all materials used for protection during shipment.
2. Find base plates , place them over the anchor bolts of prepared foundation, fasten base plates to concrete pad.
3. Place operator and barrier on to secured base plates. Tack weld in place and remove lifting hook.
4. Align gate for permanent position and secure pedestal to base plates with field welds at each corner.
5. Perform required electrical connections in accordance with diagrams shown in this manual.
6. Position fluid bypass valves to closed setting, close and secure access door.
7. If gate fails to function properly, contact manufacturer’s representative.
10
Содержание HYJD-25
Страница 7: ...IDEAL MANUFACTURING INC 3 ALTERNATE FENCE SCHEMES HYJD 25 HYJD 25E SSHYJD 25 SSHYJD 25E...
Страница 11: ...AB AB ALLEN BRADLEY IDEAL MANUFACTURING INC...
Страница 12: ...AB AB AB ALLEN BRADLEY IDEAL MANUFACTURING INC...
Страница 13: ...9 AB AB ALLEN BRADLEY IDEAL MANUFACTURING INC...
Страница 23: ...IDEAL MFG INC 19 ACTUATOR CYLINDER WITH COMPONENTS RGHY 3008...
Страница 35: ......
Страница 40: ...IDEAL MANUFACTURING INC 36...
Страница 42: ...IDEAL MANUFACTURING INC 38 RGHY 3042 A TILT A WAY ROAD GATE LOOP DETECTOR DIAGRAM...
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......