26
Concord CXS -
Installation & Servicing
SERVICING
SER
VICING
38 COMBUSTION CHAMBER
INSULATION REPLACEMENT
The insulation boards used in the combustion chambers of
these products contain man-made fibres, refractory fillers,
organic and inorganic binders and as such are deemed to
be harmless to humans.
Caradon Plumbing Limited,
however, recommend that for
your own comfort and to comply with good working practise
the procedure described below is followed.
IMPORTANT.Turn OFF
the gas and
DISCONNECT
the
electricity supply.
To replace the insulation boards the major boiler components
(including the heat exchanger and burners) have to be
removed to gain access to the combustion chamber.
Prior to removal of the boards the following protective
equipment should be worn:
•
Face mask supplied with the spare part.
•
Gloves supplied with the spare part.
1
Damp down the combustion chamber area containing the
insulation boards.
2.
Remove the insulation boards. The replacement boards are
supplied in a plastic bag. This bag should be retained and
the discarded boards should now be placed into it.
3.
Sweep any dampened particles and place in the plastic bag.
4.
Fit new insulation boards.
5.
Remove the gloves and face mask and place them in the
plastic bag.
6.
Wash your hands and any areas of skin which may have
come into contact with any of the particles from the insulation
board.
7.
Seal the plastic bag and dispose of it and its contents into a
commercial tip.
35A CONTROL SENSOR POTENTIOMETER ASSEMBLY
1.
Undo the thermostat knob retaining screw and pull off the knob.
2.
Remove the lower front panel.
3.
Undo the backnut and washer retaining the potentiometer.
4.
Undo the 2 screws securing the control box front panel, lift it and
carefully lower it.
5.
Pull off the connections at the back of the potentiometer and the
plug from the PCB.
6.
Fit the new potentiometer and reassemble in reverse order,
ensuring that the connections on the back of the potentiometer
are made either to the top 2 or the bottom 2 tags and that the lug
on the potentiometer body locates through the hole in the front
panel of the control box.
36 PC BOARD S4561B1047
1.
Remove the lower front panel.
2.
Undo the 2 screws securing the control box front panel.
Carefully lift it up and lower it down.
3
. Pull off the 2 plugs and the 2 push-on connections from
the board. The board can now be removed by squeezing
in the retaining barbs.
4.
Fit the new board and reassemble in reverse order,
ensuring that the push-on connections are correctly fitted,
as follows (from left to right): Earth - flame detector lead.
1.
Remove the lower front panel.
2.
Undo the 2 screws securing the control box front panel.
Carefully lift it up and lower it .
3
. Remove the 4 plugs from the board. The board can now
be removed by squeezing in the retaining barbs.
4.
Reassemble in reverse order.
Flame detector connection
Earth
connection
Retaining
barbs
PCB
Plugs
PCB
Potentiometer
Thermostat
knob retaining screw
Backnut
Plug
Thermostat
knob
Washer
37 PC BOARD W4115A1020
Plugs
Retaining barbs
PCB
Plugs