Concord CXi  -  

Installation

GENERAL

CHIMNEY SYSTEM

To ensure the safe and satisfactory operation of the boiler then
the chimney system (which may be common or individual, in the
case of twin or multiple boiler installations) must be capable of the
complete evacuation of combustion products at all times. The
effective height of the chimney terminal(s) above the boiler outlet(s)
must ensure sufficient buoyancy to overcome the resistance of
the bends, tees and runs of the flue pipe involved and shall
terminate in a down draught free zone.  The number of bends and
lengths of horizontal flue pipe used should be kept to a minimum
in order to reduce gas flow resistance.

Compliance with the recommendations made in BS.6644; British
Gas publication IM 11 ‘Flues for Commercial and Industrial Gas
Fired Boilers and Air Heaters’ and the’ Third Edition of the 1956
Clean Air Act Memorandum’ should be strictly observed, where
applicable.

The chimney design should avoid the formation of excessive
quantities of condensate. For this reason it is recommended that
all chimneys are insulated and lined.  In the case of brick or similar
structures a stainless steel rigid or flexible flue liner (grade 304/
316) may be used in conjunction with a 50 mm (minimum) thick
layer of vermiculite or perlite granules between the liner and the
inner skin of the chimney body.  Liners should be sealed at both
top and  bottom.

As the 

Concord

 

CXi

 range of boilers is supplied complete with an

integral draught diverter, a diverter MUST NOT be fitted within the
chimney system.

Drainage points positioned at the bottom of all vertical chimney
sections should be provided.  Drain pipes should be no less than
25 mm  I.D., manufactured from acid condensate resistant material
such as stainless steel and be positioned so that pipe runs and
discharge points are not subject to the effects of frost and that flue
gases cannot leak into the boiler room.

Care should be taken to ensure the specification of the chimney is
suitable for the application by reference to the manufacturers
literature. 

Caradon Plumbing Limited

 can offer advice on the

design of suitable chimney  systems.

GAS SUPPLY

If there is any doubt regarding the capacity of the gas meter, the
available gas pressure, the adequacy of existing service pipes or
the size required for new service pipes then the advice of the gas
supplier should be requested.

Installation pipework should be fitted and tested for gas soundness
in accordance in accordance with BS. 6891;

IGE-UP-1  for small installations
IGE-UP-2  for large installations.

The local gas supplier must be consulted if it is necessary to employ
a gas pressure booster.

ELECTRICAL SUPPLY

WARNING. 

This appliance must be efficiently earthed.

A 230 V - 50 Hz mains supply is required, fused at 5 amps.

Wiring external to the appliance MUST be in accordance with the
I.E.E. (BS. 7671) Wiring Regulations and any local regulations
which apply.

For details of connections see Frame 14.

FOUNDATION

The boiler must stand on a non-combustible floor (i.e. concrete
or brick) which must be flat, level and of a suitable load bearing
capacity to support the weight of the boiler (when filled with
water) and any ancillary equipment.

If the boiler is mounted on a plinth then the dimensions must
exceed the plan area of the boiler by at least 75mm on each
side.

VENTILATION

Safe, efficient and trouble-free operation of conventionally flued
gas boilers is vitally dependent on the provision of an adequate
supply of fresh air to the room in which the appliance is installed.
Ventilation by grilles communicating directly with the outside air is
required at both high and low levels. The minimum free areas of
these grilles must be according to the following scale:

Table 6 - Ventilation Requirements

Total input

Position of air

Air vent areas (air

rating of boilers

vents

direct from outside)

HIGH LEVEL

270 cm

2  

plus

2.25 cm

2

 per kW

in excess of 60 kW

 total rated input

Upto 2 MW

LOW LEVEL

540 cm

2   

plus

4.5 cm

2

 per kW

in excess of 60 kW

 total rated input

Position ventilation grilles to avoid the risk of accidental obstruction
by blockage or flooding.  If further guidance on ventilation is required
then consult BS.6644.

AIR SUPPLY BY MECHANICAL VENTILATION

The supply of air by mechanical means to a space housing the
boiler should be by mechanical inlet with natural or mechanical
extraction. Mechanical extract ventilation with natural inlet must
not be used.

Where a mechanical inlet and a mechanical extract system is
applied, the design ventilation flow rates should be as in Table 4 of
BS.6644.

The requirements for air supply by mechanical ventilation are given
in BS.6644.

Note. 

For mechanical ventilation systems an automatic control

should be provided to cause safety shutdown or lockout of the
boiler(s) in the event of failure of air flow in either inlet or extract
fans.

IMPORTANT.

The use of an extractor fan in the same room as the boiler (or in
an adjacent communicating room) can, in certain conditions,
adversely affect the safe operation of the boiler.  Where such a
fan is already fitted (or if it is intended to fit an extractor fan after
installation of the appliance) the advice of the gas supplier should
be obtained.

Tests for spillage of products from the draught diverter when the
extractor fan is running and all doors and windows are shut should
be carried out after installation. If spillage is detected, the area of
permanent ventilation must be increased.

Содержание Concord CXi 110

Страница 1: ......

Страница 2: ...2 Concord CXi Installation CAUTION To avoid the possibility of injury during the installation servicing or cleaning of this appliance care should be taken when handling edges of sheet steel components ...

Страница 3: ... CXi 110 180 boilers are intended for use as COMMERCIAL BOILERS and are NOT certified for use in domestic applications A domestic installation is defined as an installation where the boiler takes its combustion air from a living space or from a room directly or indirectly connected with the living space It is important therefore that no external control devices e g flue dampers economisers etc are...

Страница 4: ...safety time Maximum of 10 secs with 5 attempts with 1 minute between attempts Safety check The control de energises every 4 hours to check internal control functions Pump Pump overrun operates if the flow temperature is greater than 75 o C Boiler thermostat The boiler thermostat hysteresis is a maximum of 3 o C Table 1 Performance Data Table 3 Boiler Control specification Maximum flow temperature ...

Страница 5: ...s may be open vented or sealed The range of boilers is NOT suitable for 1 Gravity DHW systems 2 Gravity heating systems 3 Direct domestic hot water supply WATER CIRCULATION SYSTEM Due to the compact nature of the boiler the heat stored within the castings at the point of shutdown of the burner must be dissipated into the water circuit in order to avoid the overheat thermostat tripping To allow pum...

Страница 6: ...0 CXi 180 Front clearance mm in 750 29 1 2 Rear clearance mm in 200 8 Side clearance mm in 100 4 not including clearance for side fitted flow header Dimension A mm in 1036 40 3 4 1036 40 3 4 1036 40 3 4 1086 42 3 4 1140 45 Dimension B mm in 175 7 175 7 175 7 197 7 3 4 250 10 Dimension C mm in 1107 43 3 4 1107 43 3 4 1230 48 1 2 1353 53 1 4 1476 58 1 8 Dimension D mm in 816 32 1 8 816 32 1 8 939 37...

Страница 7: ...pen vented systems It is assumed incorrectly that because boilers are operating in conjunction with what is apparently a closed circuit an open vented system will not under normal circumstances allow damage or loss of efficiency due to hardness salts and corrosion once the initial charge of water has been heated up a few times 1mm of lime reduces the heat transfer from metal to water by 10 In prac...

Страница 8: ...ade to BS 6644 Section 2 Subsection 11 and Guidance note PM5 Automatically controlled steam and hot water boilers published by the Health and Safety Executive The information and guidance given below is not intended to override any requirements of either of the above publications or the requirements of the local authority gas or water undertakings In general commercial closed pressurised systems a...

Страница 9: ... to employ a gas pressure booster ELECTRICAL SUPPLY WARNING This appliance must be efficiently earthed A 230 V 50 Hz mains supply is required fused at 5 amps Wiring external to the appliance MUST be in accordance with the I E E BS 7671 Wiring Regulations and any local regulations which apply For details of connections see Frame 14 FOUNDATION The boiler must stand on a non combustible floor i e con...

Страница 10: ...e section 4 Flueway baffles 5 Section alignment rings O rings 6 Thermostat pocket INSTALLATION INSTALLATION 13 Combustion chamber 14 Tie rods 15 Lightback shield 16 Burner manifold assy 17 NOx duct 18 Gas cock not shown 7 End section 8 Distribution tube 9 Downdraught deflector 10 Section bolt 11 Drain cock 12 Base plate ...

Страница 11: ...S Each section should be brushed clean on all external surfaces and any debris which may have accumulated within the sections should be removed via the bottom ports Section Assembly refer to the exploded view 5 Take an end section and lift it onto the combustion chamber so that the combustion chamber side panel return is inside the section rear lip 6 Locate a slotted steel ring and an O ring seal ...

Страница 12: ...ashers 14 Fit the gas valve and spark generator assembly to the boiler by doing up the union in the gas line and by fastening the spark generator bracket to the combustion chamber using the two M5 screws and washers 15 Fit the gas inlet pipe and retain by the semi circular clamp screws and washers provided Tighten both unions and the inlet pipe retaining clamp ensuring that the gas valve assembly ...

Страница 13: ...s to be brought directly to the boiler the close taper nipple and 1 1 4 tee must be fitted so that the drain cock is horizontal This will reduce the possibility of the drain becoming blocked by debris 5 Complete the system connections using suitable jointing compound as follows The cast iron flow header must be fitted in the chosen flow connection which will be either of the 2 top rear tappings A ...

Страница 14: ...for the other side panel 4 Fit the upper front framework with the overheat thermostat at the bottom and with its green Legend 1 Side panel 2 Supporting angle 3 Top panel 4 Upper front panel 5 Control box 6 Bracket 7 Support frame 8 Door panel 9 Lower panel button facing forwards and secure to the front fixing bracket s using the M5 screws and washers and to each side panel using the No 8 screws 5 ...

Страница 15: ...s and washers 3 Offer up the control box to the RH side of the upper front framework so that the location buttons on the back of the control box locate in the slots Push down to locate and fasten using the No 8 screws IMPORTANT 4 Offer up the spark generator assembly to the combustion chamber base tray and secure the bracket using the M5 screws and washers Plug the spark generator leads onto the s...

Страница 16: ...mostat phial through the clips on the appropriate casing side panel to the flow header ensuring that both leads run under the support angle 8 Secure both phials into the thermostat pocket in the flow header using the spring clip 9 Fit the earths lead as shown in the illustration 10 Fit the casing upper front panel with its location buttons in the slots and push down to locate Fasten at the bottom ...

Страница 17: ...d or the boiler will not operate Fit the plug in connector into the mains voltage connection box at the back of the control box and fasten using the M4 screws and washers Check that the other 2 plug in connectors are fitted into their respective boxes Finally fit the casing top panel and push down to locate INSTALLATION INSTALLATION Any system controls should be connected via volt free contacts to...

Страница 18: ...one may be the load during overrun all zones MUST individually be able to satisfy the conditions in the foregoing paragraph and Graph 1 If not all zones can do this then consider other means of control detailed on other sheets Normal operation When any thermostat is satisfied while others are calling for heat power is available via relay contacts to close the valve for that zone When all thermosta...

Страница 19: ... the normally open contacts of the relay 17 ZONES WITH INDIVIDUALLY PUMPED ZONES 3 zones shown IMPORTANT Terminal L2 may control the appropriate pump s directly provided that the total running or starting current does not exceed 6A resistive or inductive if this rating would be exceeded then appropriate switchgear must be used to control the pumps indirectly Three zones are illustrated but the pri...

Страница 20: ...d high low burner operation In addition the microprocessor also has onboard commissioning and servicing instructions and a fault diagnosis programme The next section describes the minimum procedure to light and commission the boiler Full operating instructions for the microprocessor control and details of the high low operation system are included in Frames 26 31 INSTALLATION INSTALLATION GENERAL ...

Страница 21: ... the burner pressures and compare them to the values given in Table 1 If either pressure differs by more than 10 reset the pressures by following the procedure in Frames 24 25 24 ADJUSTING THE MANIFOLD PRESSURES 2 If desired it is possible to use the onboard commissioning instructions using the UP DOWN arrow buttons However the following paragraphs provide more detailed instructions and are recomm...

Страница 22: ...stem has the advantages of ensuring that the boiler accurately maintains the set temperature without the large temperature swings that can be associated with on off boilers prevents rapid or short cycling and provides more efficient system operation 25 ADJUSTING THE MANIFOLD PRESSURES continued After setting allow the boiler to operate for 3 minutes to stabilise then recheck the setting Note CXi 1...

Страница 23: ...racteristics described above the control system incorporates the following features accessible to the user or service engineer ADJUSTABLE BOILER TEMPERATURE CONTROL This is factory pre set at 82 C but may be adjusted by the user between 60 C and 85 C Refer to Frame 31 PROGRAMMER TIMER A maximum of 3 time periods per day can be programmed in to the boiler Note This a boiler timer only and does not ...

Страница 24: ... CXi Installation 29 DESCRIPTION AND OPERATION OF BOILER CONTROLS continued The diagram below shows the sequence of steps to be taken when reading the instructions on the following pages INSTALLATION INSTALLATION ...

Страница 25: ...he Programme Hours option is selected the boiler will go on and off subject to the times programmed If ALL DAY usage is selected the boiler will come on at the first ON period selected and off on the last OFF period selected ignoring all other time settings Based on the above backup programme this means the boiler would run subject to any other external controls from 07 30 to 22 00 hours If 24 HOU...

Страница 26: ...emain OFF for a minimum of 3 minutes or until the boiler flow temperature has dropped by 3 o C whichever is the greater time If the boiler load is such that it cycles between high and low operation the boiler will fall through 3 degrees before the high rate gas valve is energised Delayed High Rate Gas Valve Operation When the boiler is started from cold the high rate gas valve will be delayed for ...

Страница 27: ...door panel Lift and remove the casing lower front panel Undo and pull off all the plugs from the gas valve solenoids Turn off the gas at the gas inlet cock Undo the 2 unions at either side of the gas valve assembly and remove the assembly complete 34 ADJUSTMENT OF WATER FLOW RATE THROUGH THE BOILER When commissioning the heating domestic hot water system the shunt pump must be adjusted to give the...

Страница 28: ...8 REPLACEMENT OF COMPONENTS Refer to Frames 5 41 and 42 SERVICING SERVICING Pull off the leads to the spark electrode on the RH end burner access via the side of the combustion chamber Pull off the lead to the flame detector electrode at the LH end burner Lift off the casing top panel Undo the 3 elongated nuts from each of the NOx ducts and remove all the ducts Undo the M5 nuts and washers retaini...

Страница 29: ...move all the screws on either the inlet or the outlet manifold and only those 4 screws securing the faulty gas valve on the other manifold The faulty gas valve can then be removed and replaced Ensure that the arrow on the gas valve points in the direction of flow 4 Ensure that new O ring seals are fitted and that the O ring seals on the remaining gas valves are correctly in place Ensure that all s...

Страница 30: ... the cover 7 Remove the push on terminals from the thermostat body noting their positions SERVICING SERVICING LEGEND 1 Main gas inlet cock 2 Gas inlet union 3 O ring seal 4 Gas control valve 5 Gas control valve 43 OVERHEAT THERMOSTAT 6 Spark generator 7 Burner manifold 8 Main injector 9 Main burner 10 Main burner RH 11 Ignition electrodes 12 Detection electrode assembly PTP Pressure test point 8 F...

Страница 31: ... from the 7 plastic mounting pins and 2 screws and pull it forward 7 Reassemble in reverse order 45 CONTROL SENSOR 1 Lift off the casing top panel 2 Trace the sensor lead to the pocket in the flow header remove the spring clip and remove the sensor phial 3 Unclip the sensor lead from its clips on the casing Undo the screws on the connector box plug and remove it 4 Fit the new sensor and reassemble...

Страница 32: ...own comfort and to comply with good working practise the procedure described below is followed IMPORTANT Turn OFF the gas and DISCONNECT the electricity supply To replace the insulation boards the major boiler components including the heat exchanger and burners have to be removed to gain access to the combustion chamber Prior to removal of the boards the following protective equipment should be wo...

Страница 33: ... ON STANDBY 1 0 button does NOT electrically isolate the boiler Before attempting any electrical fault finding ALWAYS carry out the preliminary electrical system checks as detailed in the Instructions for the British Gas Multimeter or other similar commercially available meter The preliminary electrical system checks are the FIRST electrical checks to be carried out during a fault finding procedur...

Страница 34: ...RT OF OPERATION SHUTDOWN DELAY IGNITION LOW RATE HIGH RATE Prepurge completed Flame ON PUMP OVERRUN IF 75 C OFF 75 C Temp set point Flame ON For 55 C no delay If 55 C 3 minutes Demand off Overrun completed Demand ON If than set point FAULT FINDING FAULT FINDING ...

Страница 35: ... L B O I L E R S Is there a spark NO Refer to screens Check gas pressure Press Copy Check wiring Press Copy Replace faulty solenoid Press Copy Refer to screens Change gas valve or solenoid Press Copy Observe the display Take actions as follows depending upon the display Check system Press Copy Replace sensor Press Copy Check gas Press Copy Press Copy Check gas valve wiring Press Copy Check detecti...

Страница 36: ...nd lead gas valve CXi 110 120 140 160 180 1 139 270 28G Plug and lead gas valve CXi 180 1 111 870 29 Spark generator 1 139 300 31 Injector 4 02 mm diameter CXi 110 6 013 175 Injector 4 2mm diameter CXi 120 6 013 180 CXi 140 7 013 180 CXi 160 8 013 180 CXi 180 9 013 180 32 Flame detection electrode 1 33 Main burners Worgas CXi 110 5 138 663 Worgas CXi 120 5 138 663 Worgas CXi 140 6 138 663 Worgas C...

Страница 37: ...de panel CXi 110 to 180 1 076 978 59 Casing RH side panel CXi 110 to 180 1 079 979 60 Casing Lower front panel CXi 110 120 1 138 475 CXi 140 1 138 474 CXi 160 1 138 473 CXi 180 1 138 472 61 Casing Upper front panel CXi 110 120 1 138 470 CXi 140 1 138 469 CXi 160 1 138 468 CXi 180 1 138 467 62 Casing Top panel CXi 110 120 1 138 465 CXi 140 1 138 464 CXi 160 1 138 463 CXi 180 1 138 462 63A Overheat ...

Страница 38: ... pursues a policy of continuing improvement in the design and performance of its products The right is therefore reserved to vary specification without notice Technical Training The Caradon Plumbing Limited Technical Training Centre offers a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please...

Страница 39: ...be giving away a free boiler for the five best ideas every year to be selected by our Technical Director Please complete this form using extra sheets if required and post it or fax it to us on 01482 498699 Boiler details Model Size e g Classic RS 230 Mexico CF 3 60 etc Details on control panel door Date of Installation Installer details Name Address Post Code Telephone Please include STD code How ...

Страница 40: ...e arrange for me to join an Ideal factory tour Range guides required The Ideal Guide a specifier s and installer s introduction to the Ideal domestic boiler range The Ideal Householders Guide to assist the installer when presenting to his her customers Technical manuals required The Ideal C class combi boiler The Ideal Classic wall hung boiler The Ideal Classic System wall hung boiler The Ideal Cl...

Отзывы: