background image

Classic

FF 230

G.C. No. 41 38701

Classic

FF 240

G.C. No. 41 38702

Classic

FF 250

G.C. No. 41 38703

Classic

FF 260

G.C. No. 41 38704

Classic

FF 270

G.C. No. 41 38705

Classic

FF 280

G.C. No. 41 38706

Classic

FF 2100

G.C. No. 41 34971

Classic

FF 240 LF

G.C. No. 41 391 53

Introduction

It is essential that the instructions in this booklet are
strictly followed, for safe and economic operation

of

the boiler.

Current

Gas Safety

(Installation

& Use) Regulations

or

rules in force.

In your own interest, and that of safety, it is the law that this boiler
must be installed by a registered installer, in accordance with all
national and local regulations.

This appliance must be efficiently earthed.

Supply: 230 V-50

Hz. The fusing should be 3A.

Connection

must be made in a way that allows complete

isolation of the electrical supply such as a double pole
switch having a 3mm (1/8") contact separation in both
poles, or a plug and socket, serving only the boiler and
system controls. The means of isolation must be accessible
to the user after installation.

Important

notes

a.

This appliance must not be operated without the casing correctly

fitted and forming an adequate seal.

b.

If the boiler is installed in

a

compartment

then the compartment

MUST NOT be used for storage purposes.

c.

The ventilation provided for the boiler during installation

MUST

5.

NOT be blocked, and

a

check should be made periodically

that

6.

the ventilation areas are free from any obstruction.

d.

If it is known or suspected that

a

fault exists on the boiler then it

7.

MUST NOT be used until the fault has been corrected

by

a

CORGI registered

installer.

e.

Flammable

materials must not be placed in close proximity

to

the appliance.

Materials giving off flammable

vapours must not

be stored in the same room

as

the appliance.

f.

Under NO circumstances

should any of the sealed components

on this appliance

be used incorrectly

or tampered with.

A clearance of 533mm (21") MUST be available at the front of the

boiler for servicing.

The minimum clearances given below MUST be complied with

in order to maintain the safe running of the boiler.

Above the boiler

100 mm

(4")

At each side of the boiler

5mm

(1/4")

Underneath the boiler

100 mm

(4")

In front ofthe boiler

75 mm

(3")

If a programmer is fitted, refer to separate instructions for the
programmer before continuing.

1. CHECK THAT THE ELECTRICITY SUPPLY TO THE BOILER

IS OFF.

2. Open the controls access door by hinging downwards.

3. Ensure that the gas inlet cock (D) is OPEN.

4. Press the overheat reset button (E), located as shown in

Frame 1.

Ensure that the mains on/off switch

(C)

is in the OFF position.

Switch ON the electricity supply to the boiler. Check that all
external controls, e.g. room thermostat etc., are ON.

Turn the boiler thermostat knob (B) to position 6 and the

mains on/off switch

(C)

to ON. After about 15 seconds the

boiler will light automatically - this can be viewed through the
sight glass (A).
Set the boiler thermostat to the desired position.

CAUTION.

To avoid

the possibility

of injury

during

the installation,

servicing

or cleaning

of this

appliance

care should

be taken

when

handling

edges

of sheet

steel components

57879

Отзывы: