4
TABLE OF CONTENT
1 INTRODUCTION .......................................................................................
5
2 SUPPLY CONDITIONS ..............................................................................
6
3 WATER REGULATIONS ............................................................................
7
4.0 PRE-INSTALLATION NOTES: ................................................................
8
4.1 OVERVIEW OF KITS 1 & 2 .............................................................................................
8
4.2 KIT-1 MOUNTING DEPTH CONTROL ............................................................................
8
4.3 MOUNTING OPTIONS, QUICK OVERVIEW ................................................................10
4.4 WALL TYPES, QUICK OVERVIEW............................................................................... 11
4.5 VALVE-BOX ORIENTATION .......................................................................................... 11
4.6 KIT-1 DESCRIPTION ....................................................................................................12
4.7 VALVE-BOX SEALING SYSTEM ..................................................................................13
5.0 INSTALLATION GUIDE – KIT.1 ............................................................. 14
5.1 CONNECTING PIPE-WORK - PRELIMINARY .............................................................14
5.2 MOUNTING METHODS ................................................................................................15
5.3 USING OPTIONAL ADJUSTABLE FIXING LEGS (METHOD C) ..................................16
5.4 MOUNTING VALVE-BOX INTO A SOLID WALL ...........................................................17
5.5 MOUNTING VALVE-BOX INTO A PRE-FABRICATED POD WALL ..............................19
5.6 MOUNTING VALVE-BOX INTO A PANEL .....................................................................
20
5.7 MOUNTING VALVE-BOX INTO A TIMBER STUD WALL ..............................................21
5.8 COMPLETING PIPE-WORK .........................................................................................
23
5.9 EXAMPLES OF INSTALLATIONS .................................................................................
23
6.0 PREPARATION FOR CHROME TRIM (KIT-2) ......................................
29
6.1 DESCRIPTION OF CHROME TRIM (KIT-2) .................................................................
30
6.2 INSTALLATION OF CHROME TRIM (KIT-2) .................................................................
30
6.3 PRODUCTS WITH INTEGRAL DIVERTER ..................................................................
33
7 OPERATION ............................................................................................
33
8 MAXIMUM TEMPERATURE STOP .........................................................
35
9 CALIBRATION OF THERMOSTAT ...........................................................
35
10.0 ISOLATING VALVES & MAINTENANCE ............................................
35
10.1 COMMISSIONING & PERIODIC CHECKS. ................................................................
36
10.2 FREQUENCY OF REGULAR SERVICING .................................................................
36
11 THERMOSTATIC CARTRIDGE REPLACEMENT ..................................
37
12 FLOW CARTRIDGE REPLACEMENT ...................................................
38
13 DIVERTER CARTRIDGE REPLACEMENT ...........................................
38
14 CHECK-VALVE CARTRIDGE REPLACEMENT ....................................
40
15 CLEANING CHROME TRIM ..................................................................
40
16 SPARE PARTS .......................................................................................41