background image

12

POINTS FOR THE BOILER USER

Note.

  

In line with our current warranty policy we would ask that you check through the following guide to identify any problems 

external to the boiler prior to requesting a service engineer’s visit.  Should the problem be found to be other than with the appliance 

we reserve the right to levy a charge for the visit, or for any pre-arranged visit where access is not gained by the engineer.

Содержание VOGUE MAX SYSTEM 26IE

Страница 1: ...cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Heating For the very latest copy of literature for specification and maintenance practices...

Страница 2: ...2...

Страница 3: ...nchmark has been introduced to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ens...

Страница 4: ...must be installed by a Gas Safe Registered Engineer in accordance with the above regulations In IE the installation must be carried out by a Registered Gas Installer RGII and installed in accordance...

Страница 5: ...en supervision or instructions concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play with the appliance In cases of rep...

Страница 6: ...R OR ROOM THERMOSTAT OFF 39O C TO CYLINDER ON 39 C min max on off A B H D A Boiler Status B Burner On indication Legend C Hot Keys D Central Heating Temp Control E On Off Control F Pressure Gauge G G...

Страница 7: ...aller 01482 498663 EXIT RESTART Reset the boiler and the ignition sequence will be repeated OPERATION Central Heating With the external heating controls calling for heat the off on control E set to on...

Страница 8: ...rature for all outside weather conditions TO SHUT DOWN THE BOILER Set the off on switch E to off TO RESTART THE BOILER Repeat the procedure detailed in To light the boiler page 7 Set the off on contro...

Страница 9: ...he filling loop Press RESTART hot key on the control panel to restart the boiler If unable to do so or if the pressure continues to drop a Gas Safe Registered Engineer or in IE a Registered Gas Instal...

Страница 10: ...To unblock a frozen condensate pipe 1 Follow the routing of the plastic pipe from its exit point on the appliance through its route to its termination point Locate the frozen blockage It is likely tha...

Страница 11: ...LEAKS WITH A NAKED FLAME CLEANING For normal cleaning simply dust with a dry cloth To remove stubborn marks and stains wipe with a damp cloth and finish off with a dry cloth DO NOT use abrasive cleani...

Страница 12: ...ugh the following guide to identify any problems external to the boiler prior to requesting a service engineer s visit Should the problem be found to be other than with the appliance we reserve the ri...

Страница 13: ...tat are switched on Check batteries in programmable room stats Ensure that the mains supply to the boiler is switched on and that no trips have operated in the consumer unit FAULT FINDING If a fault o...

Страница 14: ...to the on position to switch the boiler on MENU OFF Indicates that the boiler is either heating the radiators or the hot water cylinder MENU 60O C ON Indicates that either the timer is off or the room...

Страница 15: ...Boiler is providing central heating and radiator temp is 60 C Indicates that central heating timer or room stat is off Indicates that the boiler is switched off Move off on switch E to the on position...

Страница 16: ...C and the boiler is running to protect itself from frost damage MENU BOILER FROST PROTECTION ACTIVE SWITCH OFF TEMPERATURE 19O C Indicates that a service is due To reset the service time refer to page...

Страница 17: ...entral Heating frost protection turn the On Off switch E to the Off position This screen will be shown MENU OFF To switch the boiler on turn the On Off switch into the On position E This screen will b...

Страница 18: ...MENU and the following screen will be displayed Press select and a screen similar to the following will be displayed Press EXIT twice to return to normal operation EXIT SELECT MENU SERVICE COMPANY NAM...

Страница 19: ...til the following screen is displayed Press SELECT and the following screen is displayed Press MENU SHOW EFFICIENCY LEVEL HOT WATER PREHEAT ON OFF SERVICE COMPANY PHONE NUMBER SERVICE COMPANY NAME MAX...

Страница 20: ...ucts The right is therefore reserved to vary specification without notice H E A T I N G The code of practice for the installation commissioning servicing of central heating systems Manufactured under...

Отзывы: