15
Standard Height Frame & Header Kits
300
650
2" BSP Female
BOILERS
BETWEEN
100/150 Concentric Flue Connector
ALL DIMENSIONS ARE IN mm
DN80 FLANGE CONN
SYSTEM FLOW
DN80 FLANGE CONN
SYSTEM RETURN
Gas Connection
Note 1: Mixing header and gas connections can be
located either on the LHS or RHS of the assembly to
suit needs of each particular system.
Note 2: Optional frame (UIN206970) one req'd per boiler
1100
25
1480
25
530
574 - 120kW
664 - 150kW
380
200
850
232 (150k
W
)
226 (120k
W
)
550 CRS
500
143
500
520 (120K
w
)
610 (150K
w
)
50
444
212
560
1950 (to top of Frame)
1918 (to top boiler)
Note 3: Optional low loss header (UIN219552) one req’d per cascade
7.2.2 INSTALLATION DRAWING WITH 2 - 120/150 BOILERS (SIDE BY SIDE) LOW LOSS
HEADERS OR PLATE HEAT EXCHANGERS
7.2.3 INSTALLATION DRAWING WITH 3 – 30-100 BOILERS (SIDE BY SIDE) LOW LOSS
HEADERS OR PLATE HEAT EXCHANGERS
300
650
Note 1: Mixing header and gas connections can be
located either on the LHS or RHS of the assembly to
suit needs of each particular system.
Note 2: Optional frame (UIN206970) one req'd per boiler
DN80 FLANGE CONN
SYSTEM RETURN
DN80 FLANGE CONN
SYSTEM FLOW
ALL DIMENSIONS ARE IN mm
25
2030
1650
25
2" BSP Female
Gas Connection
200
850
530
574 - 100kW
414 - 30 to 80kW
380
BOILERS
BETWEEN
30-80kW = 80/125
BETWEEN
BOILERS
Concentric Flue Connector
100kW = 100/150
50
500
130 (30-80k
W
)
226 (100k
W
)
520 (100k
W
)
360 30-80
kW
)
550 CRS
500
143
500
550 CRS
50
444
212
560
1950 (to top of Frame)
1918 (to top boiler)
Note 3: Optional low loss header (UIN219552) one req’d per cascade
Содержание Evomax 100
Страница 26: ...26 Frame Header Kits NOTES ...
Страница 27: ...27 Frame Header Kits NOTES ...