17
Minimiser SE
- Installation
INSTALLATION
18 CUTTING THE FLUE
Wall thicknesses of 114 to 580mm
Note.
If the optional stand-off bracket kit is used it is essential that
30 mm is added to the measured wall thickness when
marking the flue (to allow for the thickness of the brackets).
1.
Measure and note wall thickness X.
2.
Add 15mm (
5/8
") to dimension X and, measuring from
the groove, cut the tube.
3.
To ensure the tube is cut square, mark the flue all the
way round.
4.
Cut to length, using the cardboard support aid.
5.
Remove the cardboard support and any burrs.
REAR FLUE OUTLET
19 ASSEMBLING THE FLUE
cardboard
support cutting aid
20 MOUNTING THE BOILER
1.
Fit the 'cut to length' flue on to the flue turret.
Note.
Ensure the top groove in the flue aligns with the top of the turret
.
2.
Drill a 3.2mm dia. hole through the flue via the
hole present in the turret.
3.
Secure the turret to the flue, using the self
tapping screw provided.
1.
Lift the boiler onto the wall mounting
plate, as shown.
2.
Check the boiler alignment using a
spirit level and adjust as necessary with
the jacking screw.
3.
Align the hole in the jacking plate with
the pre-drilled hole in the wall and fix in
position with the No.10 x 2" screw
provided.
Note.
If the front of the boiler is to be flush with
the front of 300mm deep kitchen units then
the optional stand-off bracket kit should be
used - refer to the fitting instructions
supplied with the kit.
Содержание minimiser SE 30
Страница 1: ......
Страница 2: ...2 Minimiser SE Installation ...