2
Logic Combi ES -
User’s
minimum Clearances
Clearances of
165mm (6
1/2
”
) above,
100mm (4”
) below,
2.5mm (1/8”
) at the sides and
450mm (17 3/4
”) at the front of
the boiler casing must be allowed for servicing.
Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to
enable the consumer to view the system pressure gauge, and
to provide the 100mm clearance required for servicing.
To light the boiler. refer to Frame 1
If a programmer is fitted refer to separate instructions for the
programmer before continuing.
1.
CHECK THAT THE ELECTRICITY SUPPLY TO BOILER IS
OFF.
2.
Set the mains mode knob control (D) to ‘Off’.
3.
Set the Domestic Hot Water temperature control (B) and
Central Heating temperature control (C) to ‘max’.
4.
Ensure that all hot water taps are turned off.
5.
Switch ON electricity to the boiler and check that all
external controls, e.g. programmer and room thermostat,
are ON.
6.
Set the mode knob control to winter ( ).
The boiler will commence the ignition sequence, supplying
heat the central heating, if required.
Note. In normal operation the boiler status display (E) will
show codes:
Standby - no demand for heat.
CH being supplied.
DHW being supplied.
During normal operation the burner on indicator (F) will
remain illuminated when the burner is lit.
Note: If the boiler fails to light after five attempts the fault code
will be displayed.
REsET pROCEDURE
To reset boiler, turn the mode control knob (D) to reset position
and immediately turn knob back to required setting. The boiler
will repeat the ignition sequence. If the boiler still fails to light
consult a Gas Safe Registered Engineer or in IE a Registered
Gas Installer (RGII).
Introduction
The
Logic Combi Es
is a wall mounted, room sealed, condensing
combination boiler, featuring full sequence automatic spark ignition
and fan assisted combustion.
Due to the high efficiency of the boiler, condensate is produced from
the flue gases and this is drained to a suitable disposal point through
a plastic waste pipe at the base of the boiler. A condensate ‘plume’
will also be visible at the flue terminal.
The
Logic Combi Es
is a combination boiler providing both central
heating and instantaneous domestic hot water.
safety
Current gas safety (installation & Use)
regulations or rules in force.
In your own interest, and that of safety, it is the law that this boiler
must be installed by a Gas Safe Registered Engineer, in accordance
with the above regulations.
In IE, the installation must be carried out by a Registered Gas Installer
(RGII) and installed in accordance with the current edition of I.S. 813
“Domestic Gas Installations”, the current Building Regulations and
reference should be made to the current ETCI rules for electrical
installation.
It is essential that the instructions in this booklet are strictly followed,
for safe and economical operation of the boiler.
Electricity supply
This appliance must be earthed.
supply: 230 V ~ 50 hz. The fusing should be 3a.
important notes
This appliance must not be operated without the casing correctly
fitted and forming an adequate seal.
If the boiler is installed in a compartment then the compartment
MUST NOT be used for storage purposes.
If it is known or suspected that a fault exists on the boiler then
it MUST NOT BE USED until the fault has been corrected by a
Gas Safe Registered Engineer or in IE a Registered Gas Installer
(RGII).
Under NO circumstances should any of the sealed components on
this appliance be used incorrectly or tampered with.
This appliance is not intended for use by persons (including
children) with reduced physical, sensory or mental capabilities, or
lack of experience and knowledge, unless they have been given
supervision or instructions concerning use of the appliance by a
person responsible for their safety.
Children should be supervised to ensure that they do not play with
the appliance.
In cases of repeated or continuous shutdown a Gas Safe Registered
Engineer or in IE a Registered Gas Installer (RGII) should be called
to investigate and rectify the condition causing this and carry out an
operational test. Only the manufacturers original parts should be used
for replacement.
ThE BENChMaRK sERVICE INTERVaL RECORD MUsT BE COMpLETED aFTER EaCh sERVICE
Ideal stelrad group
is a member of the Benchmark scheme and fully supports the aims of
the programme. Benchmark has been introduced to improve the standards of installation and
commissioning of central heating systems in the UK and to encourage the regular servicing of all
central heating systems to ensure safety and efficiency.
All Gas Safe Register installers carry a Gas Safe Register ID card, and have a registration number. Both should be recorded in the
Benchmark Commissioning Checklist. You can check your installer by calling Gas Safe Register direct on 0800 4085500.
FOR aNy qUERIEs pLEasE RINg ThE
IDEaL CONsUMER hELpLINE : 01482 498660
NOTE. BOILER REsET pROCEDURE -
To reset boiler, turn mode control knob to reset position and immediately turn knob back to required setting.