9
Installation and Servicing
SECTION 1 - GENERAL
B
oiler
Page
Make and model ......................................................... 9
Appliance serial no. on data badge .......... Front Cover
SEDBUK No. % .......................................................... 8
Controls
Time and temperature control to heating ................. 32
Time and temperature control to hot water ............. 32
Heating zone valves
................................................n/a
TRV’s........................................................................ 13
Auto bypass ............................................................. 13
Boiler interlock .......................................................... 13
For all boilers
Flushing to BS.7593 .................................................15
Inhibitor .................................................................... 15
Central heating mode
Heat input ...................................................to be calculated
For assistance see Technical Helpline on the back page
Page
Burner operating pressure ...................................... n/a
Central heating flow temp.
...........measure and record
Central heating return temp. ........measure and record
For combination boilers only
Scale reducer ........................................................... 16
Hot water mode
Heat input ............................................to be calculated
Max. operating burner pressure .............................. n/a
Max. operating water pressure ........ measure & record
Cold water inlet temp ...................... measure & record
Hot water outlet temp. ..................... measure & record
Water flow rate at max. setting
........ measure & record
For condensing boilers only
Condensate drain ..................................................... 28
For all boilers:
complete, sign & hand over to customer
For GB, to comply with Building Regulations Part L1 (Part 6 in Scotland) the boiler should be fitted in accordance with the
manufacturer’s instructions. Self-certification that the boiler has been installed to comply with Building Regulations can be
demonstrated by completing and signing the Benchmark Commissioning Checklist.
Before installing this boiler, read the Code of Practice sheet at the rear of this book.
BENCHMARK COMMISSIONING CHECKLIST DETAILS
NOTE TO THE INSTALLER: COMPLETE
THE BENCHMARK COMMISSIONING
CHECKLIST AND LEAVE THESE
INSTRUCTIONS WITH APPLIANCE
Boiler size
G.C. Appliance No.
(Benchmark No.)
24 47-349-27
30 47-349-28
35 47-349-29
Natural Gas only
Destination Country:
GB, IE
INDE COMBI
Содержание INDEPENDENT+ COMBI 24
Страница 4: ...4 Installation and Servicing...
Страница 6: ...6 Installation and Servicing...
Страница 63: ...63 Installation and Servicing...
Страница 64: ......
Страница 70: ...70 NOTES Installation and Servicing...
Страница 71: ...71 NOTES Installation and Servicing...