54
Fault Finding
F
aul
t
F
inding
F
aul
t
F
inding
F
aul
t
F
inding
F
aul
t
F
inding
F
aul
t
F
inding
i
combi
-
Installation and Servicing
77 aLTERNaTINg ‘F’ aND ‘7’ - LOW MaINs VOLTagE
Contact electricity provider
78 aLTERNaTINg ‘F’ aND ‘9’ - pCb FaULT
79 aLTERNaTINg ‘C’ aND ‘0’ - bCC aCTIVaTION FaULT
Replace PCB -
Ensure that the BCC (boiler chip card - small plastic part) is
fitted to the PCB otherwise replace PCB.
Reset the boiler
80 aLTERNaTINg ‘c’ aND ‘2’ - bCC FaULT (bOILER ChIp CaRD)
Is the correct BCC for the boiler securely inserted into the
slot at the front left of the PCB?
(identified by the label on the BCC)
YES
NO
Securely insert the correct BCC for the boiler
into the PCB and after switching power on and
‘c0’ being shown, reset boiler.
Note.
Ensure the correct orientation of BCC by
placing “TOP” side up.
Replace the BCC with a new BCC (that is correct for the
boiler). After switching power on and ‘c0’ being shown,
press reset. Is ‘c2’ still shown?
Replace PCB
YES
REsET pROCEDURE
- To reset boiler, turn mode knob to reset position and immediately turn knob back to required setting.
REsET pROCEDURE
- To reset boiler, turn mode knob to reset position and immediately turn knob back to required setting.
Содержание i 24
Страница 2: ...2 i combi Installation and Servicing ...
Страница 58: ...58 SPARE parts i combi Installation and Servicing ...