22
Buccaneer GT Range
- Installation
ASSEMBLY
4
5
6
Control panel assembly
Place the control panel unit on the boiler body positioning it on
the assembly flanges with the M8 gudgeon pins in front and
the nipple of the unit at the rear.
Fix this to the front section with 2 HM8 nuts plus 2 toothed
washers ø 8.
Fix to the rear section with 1 HM8 x 30 screw plus 2 nuts plus
2 toothed washers ø 8.
8199-EN-31 A
8199-EN-32
Control panel and rear strut assembly
Place the control panel unit on the boiler body positioning it on
the assembly flanges with the M8 gudgeon pins in front and
the nipple in the intermediate position.
Fix this to the front section with 2 HM8 nuts plus 2 toothed
washers ø 8.
Fix the rear strut to the rear section with 1 HM8 x 30 screw
plus 2 nuts plus 2 toothed washers ø 8.
Placement of sensors
Place the thermostat sensors and the thermometer in the
spring separator and then in the pocket.
Place the thermostat sensors in first, then the probe from the
control, if there is one. In this case (4 sensors) do not use the
separator spring.
8199-EN-33
Only for 4 & 5
section boilers
Only for 3-section boilers
Only for 4 & 5 section boilers