Enabling better global research outcomes in soil, plant & environmental monitoring.
21
8.1.3 Measurement Suspend and Time Delay
This option allows you to set a time for the instrument to begin logging. This can be handy for
completely setting up an instrument prior to installation in the field. Logging can be delayed for up
to 24 hours (23:59:59), at which point it will begin to log at the set interval.
8.2
Sensor Configuration
8.2.1 Channel Configuration
Channel configuration allows you to select a conversion table or script to apply to an input
channel. Typically, the appropriate scripts for the sensors will be pre-loaded and configured.
Conversion tables and scripts are covered in
Chapter 9
.